Sl. | Name of Town/District | Name of STP | Capacity of STP (MLD) | OCEMS Status | View OCEMS | OCEMS Parameters Compliant Status |
---|---|---|---|---|---|---|
1 | Kanpur | Bingaon | 210 | Available | View | Compliant |
2 | Mathura | Trans Yamuna | 16 | Available | View | Compliant |
3 | Mathura | Trans Yamuna - 2 | 14.5 | |||
4 | Mathura | Mosani | 6.8 | Available | View | Compliant |
5 | Mathura | Masani | 30 | |||
6 | Prayagraj | Kodra | 25 | Available | View | Compliant |
7 | Prayagraj | Naini | 60 | Available | View | Compliant |
8 | Prayagraj | Naini - 2 | 20 | Available | View | Compliant |
9 | Prayagraj | Numayadahi | 50 | Available | View | Compliant |
10 | Prayagraj | Ponghat | 10 | Available | View | Compliant |
11 | Prayagraj | Rajapur | 60 | Available | View | Compliant |
12 | Prayagraj | Salori - 1 | 29 | Available | View | Compliant |
13 | Etawah | Karanpur | 10.45 | Available | View | Compliant |
14 | Etawah | Umrain | 13.45 | Available | View | Compliant |
15 | Etawah | Etawah | 21 | Available | View | Compliant |
16 | Kanpur | Sajari | 42 | Available | View | Compliant |
17 | Kasganj | Kasganj | 15 | Available | View | Compliant |
18 | Varanasi | Ramna | 50 | Available | View | Compliant |
19 | Varanasi | Ramnagar | 10 | Available | View | Compliant |
20 | Vrindavan | Near Pagal Baba Mandir | 4 | Available | View | Compliant |
21 | Anupshahar | Anupshahar Zone A | 1.5 | Not Available | Installation of OCEMS has been completed under AMRUT. Undergoing trial-run as data calibration is being done. | |
22 | Anupshahar | Anupshahar Zone B | 1 | Not Available | ||
23 | Bithoor | Bithoor | 1.3 | Not Available | OCEMS is not feasible as STP is based on constructed wetland technology. | |
24 | Garhmukteshwar | Garhmukteshwar-I | 6 | Not Available | Installation of OCEMS has been completed under AMRUT. Undergoing trial-run as data calibration is being done. | |
25 | Garhmukteshwar | Garhmukteshwar-II | 3 | Not Available | ||
26 | Kanpur | Jajmau - 2 | 130 | Not Available | Installation of OCEMS is proposed under Namami Gange ongoing rehabilitation works. Will be completed by Mar - 2023. | |
27 | Kanpur | Kanpur | 43 | Not Available | ||
28 | Mirzapur | Pucca Pokhra | 14 | Not Available | Installation of OCEMS is proposed under Namami Gange. Will be completed by Oct - 2023. | |
29 | Moradabad | Moradabad | 58 | Not Available | Installation of OCEMS has been completed under AMRUT. Undergoing trial-run as data calibration is being done. | |
30 | Narora | Narora | 4 | Not Available | Installation of OCEMS has been completed under AMRUT. Undergoing trial-run as data calibration is being done. | |
31 | Sultanpur | Lolepur | 5 | Not Available | Installation of OCEMS is proposed under Namami Gange ongoing rehabilitation works. Will be completed by Dec - 2022. | |
32 | Varanasi | Bhagwanpur | 9.8 | Not Available | Installation of OCEMS has been completed under AMRUT. Undergoing trial-run as data calibration is being done. |
Sl. No. | District | River | Running STPs | No. of Under Construction STPs | No. of DPR Prepared STPs | |||
---|---|---|---|---|---|---|---|---|
No. of STPs | STP Capcity (MLD) | No. of STPs | STP Capcity (MLD) | No. of STPs | STP Capcity (MLD) | |||
A | B | C Filter: |
D | E | F | G | H | I |
1 | Agra
Agra No. of Running STPs: 9 No. of Running STPs Capcity (MLD): 220.75 No. of Under Construction STPs: 13 No. of Under Construction STPs Capacity (MLD): 177.6 No. of DPR Prepared STPs: 1 No. of DPR Prepared STPs Capacity (MLD): 0 |
Yamuna | 9 | 220.75 | 13 | 177.6 | 1 | 0 |
2 | Aligarh
Aligarh No. of DPR Prepared STPs: 1 No. of DPR Prepared STPs Capacity (MLD): 113 No. of Under Construction STPs: No. of Under Construction STPs Capacity (MLD): |
Ganga, Yamuna | 0 | 0 | 0 | 0 | 1 | 113 |
3 | Ambedkar Nagar
Ambedkar Nagar No. of DPR Prepared STPs: 1 No. of DPR Prepared STPs Capacity (MLD): 15 No. of Under Construction STPs: No. of Under Construction STPs Capacity (MLD): |
Ghaghara | 0 | 0 | 0 | 0 | 1 | 15 |
4 | Amethi
Amethi |
Gomti | 0 | 0 | 0 | 0 | 0 | 0 |
5 | Amroha
Amroha |
Ganga | 0 | 0 | 0 | 0 | 0 | 0 |
6 | Auraiya
Auraiya |
Yamuna | 0 | 0 | 0 | 0 | 0 | 0 |
7 | Ayodhya
Ayodhya No. of Running STPs: 1 No. of Running STPs Capcity (MLD): 12.00 No. of Under Construction STPs: 1 No. of Under Construction STPs Capacity (MLD): 33 |
Saryu | 1 | 12 | 1 | 33 | 0 | 0 |
8 | Azamgarh
Azamgarh |
Tamsa | 0 | 0 | 0 | 0 | 0 | 0 |
9 | Baghpat
Baghpat No. of DPR Prepared STPs: No. of DPR Prepared STPs Capacity (MLD): No. of Under Construction STPs: 1 No. of Under Construction STPs Capacity (MLD): 14 |
Yamuna | 0 | 0 | 1 | 14 | 0 | 0 |
10 | Bahraich
Bahraich |
Saryu | 0 | 0 | 0 | 0 | 0 | 0 |
11 | Ballia
Ballia |
Ganga | 0 | 0 | 0 | 0 | 0 | 0 |
12 | Balrampur
Balrampur |
Rapti | 0 | 0 | 0 | 0 | 0 | 0 |
13 | Banda
Banda No. of Running STPs: 1 No. of Running STPs Capcity (MLD): 4.00 |
Yamuna | 1 | 4 | 0 | 0 | 0 | 0 |
14 | Barabanki
Barabanki |
Gomti | 0 | 0 | 0 | 0 | 0 | 0 |
15 | Bareilly
Bareilly No. of DPR Prepared STPs: No. of DPR Prepared STPs Capacity (MLD): No. of Under Construction STPs: 3 No. of Under Construction STPs Capacity (MLD): 63 |
Ramganga | 0 | 0 | 3 | 63 | 0 | 0 |
16 | Basti
Basti |
Ghaghara | 0 | 0 | 0 | 0 | 0 | 0 |
17 | Bijnor
Bijnor No. of Running STPs: 1 No. of Running STPs Capcity (MLD): 24.00 |
Ganga | 1 | 24 | 0 | 0 | 0 | 0 |
18 | Budaun
Budaun |
Ganga | 0 | 0 | 0 | 0 | 0 | 0 |
19 | Bulandshahr
Bulandshahr No. of Running STPs: 7 No. of Running STPs Capcity (MLD): 51.32 No. of DPR Prepared STPs: 1 No. of DPR Prepared STPs Capacity (MLD): 10 |
Ganga | 7 | 51.32 | 0 | 0 | 1 | 10 |
20 | Chandauli
Chandauli No. of DPR Prepared STPs: 1 No. of DPR Prepared STPs Capacity (MLD): 37 No. of Under Construction STPs: No. of Under Construction STPs Capacity (MLD): |
Ganga | 0 | 0 | 0 | 0 | 1 | 37 |
21 | Chitrakoot
Chitrakoot No. of Running STPs: 1 No. of Running STPs Capcity (MLD): 3.42 |
Yamuna | 1 | 3.42 | 0 | 0 | 0 | 0 |
22 | Deoria
Deoria |
Ghaghara | 0 | 0 | 0 | 0 | 0 | 0 |
23 | Etah
Etah No. of Running STPs: 1 No. of Running STPs Capcity (MLD): 24.00 |
Ishan | 1 | 24 | 0 | 0 | 0 | 0 |
24 | Etawah
Etawah No. of Running STPs: 4 No. of Running STPs Capcity (MLD): 46.50 |
Yamuna | 4 | 46.5 | 0 | 0 | 0 | 0 |
25 | Farrukhabad
Farrukhabad No. of Running STPs: 1 No. of Running STPs Capcity (MLD): 2.70 No. of Under Construction STPs: 3 No. of Under Construction STPs Capacity (MLD): 45 |
Ganga | 1 | 2.7 | 3 | 45 | 0 | 0 |
26 | Fatehpur
Fatehpur |
Ganga, Yamuna | 0 | 0 | 0 | 0 | 0 | 0 |
27 | Firozabad
Firozabad No. of Running STPs: 2 No. of Running STPs Capcity (MLD): 70.00 |
Yamuna | 2 | 70 | 0 | 0 | 0 | 0 |
28 | Gautam Buddha Nagar
Gautam Buddha Nagar No. of Running STPs: 10 No. of Running STPs Capcity (MLD): 405.00 |
Yamuna | 10 | 405 | 0 | 0 | 0 | 0 |
29 | Ghaziabad
Ghaziabad No. of Running STPs: 11 No. of Running STPs Capcity (MLD): 535.00 |
Hindon | 11 | 535 | 0 | 0 | 0 | 0 |
30 | Ghazipur
Ghazipur No. of DPR Prepared STPs: No. of DPR Prepared STPs Capacity (MLD): No. of Under Construction STPs: 1 No. of Under Construction STPs Capacity (MLD): 21 |
Ganga | 0 | 0 | 1 | 21 | 0 | 0 |
31 | Gonda
Gonda |
Ghaghara | 0 | 0 | 0 | 0 | 0 | 0 |
32 | Gorakhpur
Gorakhpur No. of Running STPs: 2 No. of Running STPs Capcity (MLD): 45.00 No. of DPR Prepared STPs: 2 No. of DPR Prepared STPs Capacity (MLD): 50.6 |
Ramgarhtal | 2 | 45 | 0 | 0 | 2 | 50.6 |
33 | Hamirpur
Hamirpur |
Yamuna | 0 | 0 | 0 | 0 | 0 | 0 |
34 | Hapur
Hapur No. of Running STPs: 4 No. of Running STPs Capcity (MLD): 42.00 No. of DPR Prepared STPs: 1 No. of DPR Prepared STPs Capacity (MLD): 6 |
Ganga | 4 | 42 | 0 | 0 | 1 | 6 |
35 | Hardoi
Hardoi |
Sai | 0 | 0 | 0 | 0 | 0 | 0 |
36 | Hathras
Hathras No. of DPR Prepared STPs: 1 No. of DPR Prepared STPs Capacity (MLD): 24 No. of Under Construction STPs: No. of Under Construction STPs Capacity (MLD): |
Yamuna | 0 | 0 | 0 | 0 | 1 | 24 |
37 | Jalaun
Jalaun |
Yamuna | 0 | 0 | 0 | 0 | 0 | 0 |
38 | Jaunpur
Jaunpur No. of DPR Prepared STPs: No. of DPR Prepared STPs Capacity (MLD): No. of Under Construction STPs: 1 No. of Under Construction STPs Capacity (MLD): 30 |
Gomti | 0 | 0 | 1 | 30 | 0 | 0 |
39 | Jhansi
Jhansi No. of Running STPs: 1 No. of Running STPs Capcity (MLD): 26.00 |
Betwa | 1 | 26 | 0 | 0 | 0 | 0 |
40 | Kannauj
Kannauj No. of Running STPs: 1 No. of Running STPs Capcity (MLD): 13.00 |
Ganga | 1 | 13 | 0 | 0 | 0 | 0 |
41 | Kanpur Dehat
Kanpur Dehat |
Yamuna | 0 | 0 | 0 | 0 | 0 | 0 |
42 | Kanpur Nagar
Kanpur Nagar No. of Running STPs: 8 No. of Running STPs Capcity (MLD): 482.30 No. of Under Construction STPs: 1 No. of Under Construction STPs Capacity (MLD): 30 No. of DPR Prepared STPs: 1 No. of DPR Prepared STPs Capacity (MLD): 0 |
Ganga, Yamuna | 8 | 482.3 | 1 | 30 | 1 | 0 |
43 | Kasganj
Kasganj No. of Running STPs: 1 No. of Running STPs Capcity (MLD): 15.00 |
Ganga | 1 | 15 | 0 | 0 | 0 | 0 |
44 | Kaushambi
Kaushambi |
Ganga, Yamuna | 0 | 0 | 0 | 0 | 0 | 0 |
45 | Kushi Nagar
Kushi Nagar |
Gandak | 0 | 0 | 0 | 0 | 0 | 0 |
46 | Lakhimpur Kheri
Lakhimpur Kheri |
Sharda, Ghaghara | 0 | 0 | 0 | 0 | 0 | 0 |
47 | Lalitpur
Lalitpur |
Betwa | 0 | 0 | 0 | 0 | 0 | 0 |
48 | Lucknow
Lucknow No. of Running STPs: 5 No. of Running STPs Capcity (MLD): 445.00 No. of Under Construction STPs: 2 No. of Under Construction STPs Capacity (MLD): 40 No. of DPR Prepared STPs: 3 No. of DPR Prepared STPs Capacity (MLD): 225 |
Gomti | 5 | 445 | 2 | 40 | 3 | 225 |
49 | Maharajganj
Maharajganj |
Rohin | 0 | 0 | 0 | 0 | 0 | 0 |
50 | Mahoba
Mahoba |
Dhasan | 0 | 0 | 0 | 0 | 0 | 0 |
51 | Mainpuri
Mainpuri No. of Running STPs: 1 No. of Running STPs Capcity (MLD): 23.00 |
Kali | 1 | 23 | 0 | 0 | 0 | 0 |
52 | Mathura
Mathura No. of Running STPs: 7 No. of Running STPs Capcity (MLD): 82.06 No. of DPR Prepared STPs: 4 No. of DPR Prepared STPs Capacity (MLD): 91 |
Yamuna | 7 | 82.06 | 0 | 0 | 4 | 91 |
53 | Mau
Mau No. of DPR Prepared STPs: 1 No. of DPR Prepared STPs Capacity (MLD): 3.5 No. of Under Construction STPs: No. of Under Construction STPs Capacity (MLD): |
Saryu | 0 | 0 | 0 | 0 | 1 | 3.5 |
54 | Meerut
Meerut No. of Running STPs: 14 No. of Running STPs Capcity (MLD): 179.00 |
Ganga | 14 | 179 | 0 | 0 | 0 | 0 |
55 | Mirzapur
Mirzapur No. of Running STPs: 2 No. of Running STPs Capcity (MLD): 21.00 No. of Under Construction STPs: 2 No. of Under Construction STPs Capacity (MLD): 17 |
Ganga | 2 | 21 | 2 | 17 | 0 | 0 |
56 | Moradabad
Moradabad No. of Running STPs: 2 No. of Running STPs Capcity (MLD): 78.00 No. of Under Construction STPs: 1 No. of Under Construction STPs Capacity (MLD): 25 No. of DPR Prepared STPs: 1 No. of DPR Prepared STPs Capacity (MLD): 43 |
Ramganga | 2 | 78 | 1 | 25 | 1 | 43 |
57 | Muzaffarnagar
Muzaffarnagar No. of Running STPs: 1 No. of Running STPs Capcity (MLD): 32.50 No. of Under Construction STPs: 3 No. of Under Construction STPs Capacity (MLD): 64.5 |
Kali | 1 | 32.5 | 3 | 64.5 | 0 | 0 |
58 | Pilibhit
Pilibhit |
Ramganga | 0 | 0 | 0 | 0 | 0 | 0 |
59 | Pratapgarh
Pratapgarh No. of DPR Prepared STPs: 1 No. of DPR Prepared STPs Capacity (MLD): 2.4 No. of Under Construction STPs: No. of Under Construction STPs Capacity (MLD): |
Ganga | 0 | 0 | 0 | 0 | 1 | 2.4 |
60 | Prayagraj
Prayagraj No. of Running STPs: 8 No. of Running STPs Capcity (MLD): 268.00 No. of Under Construction STPs: 3 No. of Under Construction STPs Capacity (MLD): 72 No. of DPR Prepared STPs: 4 No. of DPR Prepared STPs Capacity (MLD): 233.4 |
Ganga, Yamuna | 8 | 268 | 3 | 72 | 4 | 233.4 |
61 | Rae Bareli
Rae Bareli No. of Running STPs: 1 No. of Running STPs Capcity (MLD): 18.00 No. of DPR Prepared STPs: 1 No. of DPR Prepared STPs Capacity (MLD): 0.006 |
Sai | 1 | 18 | 0 | 0 | 1 | 0.006 |
62 | Rampur
Rampur No. of Running STPs: 3 No. of Running STPs Capcity (MLD): 34.00 |
Ramganga | 3 | 34 | 0 | 0 | 0 | 0 |
63 | Saharanpur
Saharanpur No. of Running STPs: 1 No. of Running STPs Capcity (MLD): 38.00 No. of DPR Prepared STPs: 1 No. of DPR Prepared STPs Capacity (MLD): 17 |
Hindon | 1 | 38 | 0 | 0 | 1 | 17 |
64 | Sambhal
Sambhal |
Ganga | 0 | 0 | 0 | 0 | 0 | 0 |
65 | Sant Kabeer Nagar
Sant Kabeer Nagar |
Aami | 0 | 0 | 0 | 0 | 0 | 0 |
66 | Sant Ravidas Nagar
Bhadohi |
Ganga | 0 | 0 | 0 | 0 | 0 | 0 |
67 | Shahjahanpur
Shahjahanpur |
Garra | 0 | 0 | 0 | 0 | 0 | 0 |
68 | Shamli
Shamli No. of DPR Prepared STPs: 4 No. of DPR Prepared STPs Capacity (MLD): 56 No. of Under Construction STPs: 1 No. of Under Construction STPs Capacity (MLD): 15 |
Krishni | 0 | 0 | 1 | 15 | 4 | 56 |
69 | Shravasti
Shravasti |
Rapti | 0 | 0 | 0 | 0 | 0 | 0 |
70 | Siddharth Nagar
Siddharth Nagar |
Rapti | 0 | 0 | 0 | 0 | 0 | 0 |
71 | Sitapur
Sitapur |
Gomti | 0 | 0 | 0 | 0 | 0 | 0 |
72 | Sonbhadra
Sonbhadra |
Son | 0 | 0 | 0 | 0 | 0 | 0 |
73 | Sultanpur
Sultanpur No. of Running STPs: 1 No. of Running STPs Capcity (MLD): 5.00 No. of Under Construction STPs: 3 No. of Under Construction STPs Capacity (MLD): 17 |
Gomti | 1 | 5 | 3 | 17 | 0 | 0 |
74 | Unnao
Unnao No. of DPR Prepared STPs: No. of DPR Prepared STPs Capacity (MLD): No. of Under Construction STPs: 2 No. of Under Construction STPs Capacity (MLD): 20 |
Ganga | 0 | 0 | 2 | 20 | 0 | 0 |
75 | Varanasi
Varanasi No. of Running STPs: 7 No. of Running STPs Capcity (MLD): 421.80 No. of DPR Prepared STPs: 2 No. of DPR Prepared STPs Capacity (MLD): 110 |
Ganga | 7 | 421.8 | 0 | 0 | 2 | 110 |
Total | 119 | 3667.35 | 41 | 684.1 | 32 | 1036.91 |
S.No. | District/Town | Name of River | Total Drains | Tapped Drains | Partially Tapped Drains | Untapped Drains | Dry drain/Tapping Not required /Industrial Drains | Action plan for Partially tapped and Untapped Drains | |||
---|---|---|---|---|---|---|---|---|---|---|---|
Under construction | PFR/DPR Submitted for Approval | Sanctioned/ Tendering | DPR to be prepared |
||||||||
A | B | C | D (E+F+G+H) | E | F | G | H | I | J | K | L |
1 | Agra | Yamuna | 90 | 21 | 8 | 61 | 0 | 23 | 45 | 0 | 1 |
2 | Aligarh | Yamuna | 8 | 0 | 0 | 2 | 6 | 0 | 2 | 0 | 0 |
3 | Auraiya | Yamuna | 2 | 0 | 0 | 2 | 0 | 0 | 2 | 0 | 0 |
4 | Baghpat | Yamuna | 4 | 3 | 0 | 1 | 0 | 1 | 0 | 0 | 0 |
5 | Chitrakoot | Yamuna | 1 | 0 | 0 | 1 | 0 | 0 | 0 | 0 | 1 |
6 | Etawah | Yamuna | 2 | 2 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
7 | Firozabad | Yamuna | 3 | 2 | 0 | 0 | 1 | 0 | 0 | 0 | 0 |
8 | Hamirpur | Yamuna | 1 | 0 | 0 | 1 | 0 | 0 | 0 | 0 | 1 |
9 | Hathras | Yamuna | 1 | 0 | 0 | 1 | 0 | 0 | 1 | 0 | 0 |
10 | Jalaun | Yamuna | 1 | 0 | 0 | 1 | 0 | 0 | 0 | 0 | 1 |
11 | Mathura | Yamuna | 51 | 30 | 1 | 20 | 0 | 0 | 0 | 21 | 0 |
12 | Prayagraj | Yamuna | 30 | 11 | 0 | 17 | 2 | 4 | 13 | 0 | 0 |
13 | Shamli | Yamuna | 1 | 0 | 0 | 1 | 0 | 1 | 0 | 0 | 0 |
Grand Total | 195 | 69 | 9 | 108 | 9 | 29 | 63 | 21 | 4 |
S.No. | District/Town | Name of River | Total Drains | Tapped Drains | Partially Tapped Drains | Untapped Drains | Dry drain/Tapping Not required /Industrial Drains | Action plan for Partially tapped and Untapped Drains | |||
---|---|---|---|---|---|---|---|---|---|---|---|
Under construction | PFR/DPR Submitted for Approval | Sanctioned/ Tendering | DPR to be prepared |
||||||||
A | B | C | D (E+F+G+H) | E | F | G | H | I | J | K | L |
1 | Amroha | Ganga | 1 | 0 | 0 | 1 | 0 | 0 | 0 | 0 | 1 |
2 | Ballia | Ganga | 1 | 0 | 0 | 1 | 0 | 0 | 0 | 0 | 1 |
3 | Bijnore | Ganga | 3 | 2 | 0 | 0 | 1 | 0 | 0 | 0 | 0 |
4 | Bulandshahar | Ganga | 2 | 2 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
5 | Chandauli | Ganga | 2 | 0 | 0 | 2 | 0 | 0 | 2 | 0 | 0 |
6 | Farrukhabad | Ganga | 8 | 0 | 2 | 5 | 1 | 7 | 0 | 0 | 0 |
7 | Ghazipur | Ganga | 34 | 0 | 0 | 34 | 0 | 23 | 11 | 0 | 0 |
8 | Hapur | Ganga | 2 | 2 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
9 | Kannauj | Ganga | 3 | 3 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
10 | Kanpur | Ganga | 25 | 19 | 0 | 5 | 1 | 0 | 5 | 0 | 0 |
11 | Mirzapur | Ganga | 36 | 10 | 0 | 12 | 14 | 12 | 0 | 0 | 0 |
12 | Pratapgarh | Ganga | 8 | 0 | 0 | 5 | 3 | 0 | 5 | 0 | 0 |
13 | Prayagraj | Ganga | 46 | 11 | 7 | 27 | 1 | 13 | 21 | 0 | 0 |
14 | Raebareilly | Ganga | 9 | 0 | 0 | 9 | 0 | 0 | 9 | 0 | 0 |
15 | Unnao | Ganga | 8 | 1 | 0 | 6 | 1 | 4 | 0 | 0 | 2 |
16 | Varanasi | Ganga | 28 | 26 | 2 | 0 | 0 | 0 | 0 | 2 | 0 |
Grand Total | 216 | 76 | 11 | 107 | 22 | 59 | 53 | 2 | 4 |
S.No. | District/Town | Name of River | Total Drains | Tapped Drains | Partially Tapped Drains | Untapped Drains | Dry drain/Tapping Not required /Industrial Drains | Action plan for Partially tapped and Untapped Drains | |||
---|---|---|---|---|---|---|---|---|---|---|---|
Under construction | PFR/DPR Submitted for Approval | Sanctioned/ Tendering | DPR to be prepared |
||||||||
A | B | C Filter: |
D (E+F+G+H) | E | F | G | H | I | J | K | L |
1 | Agra | Yamuna | 90 | 21 | 8 | 61 | 0 | 23 | 45 | 0 | 1 |
2 | Aligarh | Yamuna | 8 | 0 | 0 | 2 | 6 | 0 | 2 | 0 | 0 |
3 | Ambedkarnagar | Tamsa | 12 | 0 | 0 | 11 | 1 | 0 | 0 | 0 | 11 |
Ghaghara | 9 | 0 | 0 | 9 | 0 | 0 | 8 | 0 | 1 | ||
4 | Amethi | Gomti | 1 | 0 | 0 | 1 | 0 | 0 | 0 | 0 | 1 |
5 | Amroha | Ganga | 1 | 0 | 0 | 1 | 0 | 0 | 0 | 0 | 1 |
6 | Auraiya | Yamuna | 2 | 0 | 0 | 2 | 0 | 0 | 2 | 0 | 0 |
7 | Ayodhya | Saryu | 21 | 5 | 0 | 16 | 0 | 15 | 0 | 0 | 1 |
8 | Azamgarh | Tamsa | 22 | 0 | 0 | 22 | 0 | 0 | 0 | 0 | 22 |
9 | Baghpat | Yamuna | 4 | 3 | 0 | 1 | 0 | 1 | 0 | 0 | 0 |
Hindon | 1 | 0 | 0 | 1 | 0 | 0 | 0 | 0 | 1 | ||
10 | Ballia | Ganga | 1 | 0 | 0 | 1 | 0 | 0 | 0 | 0 | 1 |
11 | Banda | Ken | 1 | 0 | 0 | 1 | 0 | 0 | 0 | 0 | 1 |
12 | Barabanki | Gomti | 1 | 0 | 0 | 1 | 0 | 0 | 0 | 0 | 1 |
13 | Bareilly | Ramganga | 15 | 0 | 0 | 15 | 0 | 15 | 0 | 0 | 0 |
14 | Bhadohi | Varuna | 3 | 0 | 0 | 3 | 0 | 0 | 0 | 0 | 3 |
15 | Bijnore | Ganga | 3 | 2 | 0 | 0 | 1 | 0 | 0 | 0 | 0 |
16 | Bulandshahar | Kali | 17 | 0 | 0 | 15 | 2 | 12 | 1 | 0 | 2 |
Ganga | 2 | 2 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
17 | Chandauli | Ganga | 2 | 0 | 0 | 2 | 0 | 0 | 2 | 0 | 0 |
18 | Chitrakoot | Yamuna | 1 | 0 | 0 | 1 | 0 | 0 | 0 | 0 | 1 |
19 | Deoria | Ghaghara | 2 | 0 | 0 | 2 | 0 | 0 | 2 | 0 | 0 |
20 | Etawah | Yamuna | 2 | 2 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
21 | Farrukhabad | Ganga | 8 | 0 | 2 | 5 | 1 | 7 | 0 | 0 | 0 |
22 | Firozabad | Yamuna | 3 | 2 | 0 | 0 | 1 | 0 | 0 | 0 | 0 |
23 | Gautam Buddh Nagar | Hindon | 2 | 0 | 0 | 2 | 0 | 0 | 0 | 0 | 2 |
24 | Ghaziabad | Hindon | 12 | 1 | 0 | 11 | 0 | 0 | 4 | 2 | 5 |
Kali | 1 | 0 | 0 | 1 | 0 | 1 | 0 | 0 | 0 | ||
25 | Ghazipur | Ganga | 34 | 0 | 0 | 34 | 0 | 23 | 11 | 0 | 0 |
26 | Gorakhpur | Ramgarhtal | 24 | 6 | 0 | 18 | 0 | 18 | 0 | 0 | 0 |
Rapti/Rohini | 15 | 0 | 0 | 15 | 0 | 3 | 12 | 0 | 0 | ||
Ghaghara | 4 | 0 | 0 | 4 | 0 | 0 | 4 | 0 | 0 | ||
27 | Hamirpur | Yamuna | 1 | 0 | 0 | 1 | 0 | 0 | 0 | 0 | 1 |
Betwa | 1 | 0 | 0 | 1 | 0 | 0 | 0 | 0 | 1 | ||
28 | Hapur | Ganga | 2 | 2 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Kali | 3 | 0 | 0 | 2 | 1 | 0 | 1 | 0 | 1 | ||
29 | Hardoi | Sai | 1 | 0 | 0 | 0 | 1 | 0 | 0 | 0 | 0 |
30 | Hathras | Yamuna | 1 | 0 | 0 | 1 | 0 | 0 | 1 | 0 | 0 |
31 | Jalaun | Yamuna | 1 | 0 | 0 | 1 | 0 | 0 | 0 | 0 | 1 |
32 | Jaunpur | Gomti | 21 | 2 | 0 | 19 | 0 | 12 | 0 | 0 | 7 |
33 | Jhansi | Betwa | 1 | 0 | 0 | 1 | 0 | 0 | 0 | 0 | 1 |
34 | Kannauj | Ganga | 3 | 3 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
35 | Kanpur | Ganga | 25 | 19 | 0 | 5 | 1 | 0 | 5 | 0 | 0 |
Pandu | 5 | 1 | 2 | 2 | 0 | 2 | 2 | 0 | 0 | ||
36 | Kasganj | Kali | 3 | 2 | 0 | 0 | 1 | 0 | 0 | 0 | 0 |
37 | Lucknow | Gomti | 33 | 21 | 4 | 7 | 1 | 5 | 6 | 0 | 0 |
Sai | 1 | 0 | 0 | 1 | 0 | 0 | 1 | 0 | 0 | ||
38 | Mathura | Yamuna | 51 | 30 | 1 | 20 | 0 | 0 | 0 | 21 | 0 |
39 | Mau | Ghaghara | 4 | 0 | 0 | 4 | 0 | 0 | 4 | 0 | 0 |
Tamsa | 16 | 0 | 0 | 16 | 0 | 0 | 0 | 0 | 16 | ||
40 | Meerut | Kali | 3 | 0 | 1 | 2 | 0 | 0 | 0 | 2 | 1 |
Hindon | 2 | 0 | 0 | 2 | 0 | 0 | 0 | 0 | 2 | ||
41 | Mirzapur | Ganga | 36 | 10 | 0 | 12 | 14 | 12 | 0 | 0 | 0 |
Jargo | 8 | 0 | 0 | 0 | 8 | 0 | 0 | 0 | 0 | ||
42 | Moradabad | Ramganga | 24 | 14 | 0 | 10 | 0 | 5 | 2 | 0 | 3 |
43 | Muzzafarnagar | Kali | 14 | 3 | 0 | 11 | 0 | 8 | 0 | 0 | 3 |
44 | Pratapgarh | Sai | 4 | 0 | 0 | 4 | 0 | 4 | 0 | 0 | 0 |
Ganga | 8 | 0 | 0 | 5 | 3 | 0 | 5 | 0 | 0 | ||
45 | Prayagraj | Ganga | 46 | 11 | 7 | 27 | 1 | 13 | 21 | 0 | 0 |
Yamuna | 30 | 11 | 0 | 17 | 2 | 4 | 13 | 0 | 0 | ||
46 | Raebareilly | Ganga | 9 | 0 | 0 | 9 | 0 | 0 | 9 | 0 | 0 |
Sai | 7 | 0 | 0 | 7 | 0 | 3 | 4 | 0 | 0 | ||
47 | Rampur | Ramganga | 1 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
48 | Saharanpur | Hindon | 109 | 38 | 0 | 71 | 0 | 0 | 4 | 61 | 6 |
49 | Santkabirnagar | Aami | 3 | 0 | 0 | 3 | 0 | 3 | 0 | 0 | 0 |
50 | Shamli | Krishni | 10 | 0 | 0 | 10 | 0 | 0 | 10 | 0 | 0 |
Yamuna | 1 | 0 | 0 | 1 | 0 | 1 | 0 | 0 | 0 | ||
Hindon | 2 | 0 | 0 | 2 | 0 | 0 | 0 | 0 | 2 | ||
51 | Sitapur | Gomti | 3 | 0 | 0 | 2 | 1 | 0 | 0 | 0 | 2 |
52 | Sultanpur | Gomti | 6 | 0 | 0 | 5 | 1 | 5 | 0 | 0 | 0 |
53 | Unnao | Ganga | 8 | 1 | 0 | 6 | 1 | 4 | 0 | 0 | 2 |
54 | Varanasi | Ganga | 28 | 26 | 2 | 0 | 0 | 0 | 0 | 2 | 0 |
Varuna | 15 | 14 | 0 | 1 | 0 | 0 | 1 | 0 | 0 | ||
Grand Total | 874 | 253 | 27 | 546 | 48 | 199 | 182 | 88 | 104 |
S.No. | District | No. of Completed Projects | No. of Ongoing Projects | No. of Under Tendering Projects | Total No. of Projects | Total Sanctioned Cost of Projects (in Cr.) | Total Work Cost of Projects (in Cr.) | Total Financial Progress (in Cr.) |
---|---|---|---|---|---|---|---|---|
A | B | C | D | E | F | G | H | I |
1 | Agra
Agra No. of Ongoing Projects: 1 No. of Under Tendering Projects: 0 |
0 | 1 | 0 | 1 | 842.25 | 371.29 | 12.7 |
2 | Ayodhya
Ayodhya No. of Completed Projects: 1 No. of Ongoing Projects: 1 No. of Under Tendering Projects: 0 |
1 | 1 | 0 | 2 | 259.33 | 132.9 | 19.87 |
3 | Baghpat
Baghpat No. of Ongoing Projects: 1 No. of Under Tendering Projects: 0 |
0 | 1 | 0 | 1 | 77.36 | 38.72 | 25.86 |
4 | Bareilly
Bareilly No. of Ongoing Projects: 1 No. of Under Tendering Projects: 0 |
0 | 1 | 0 | 1 | 271.39 | 139.44 | 5.35 |
5 | Bulandshahr
Bulandshahr No. of Completed Projects: 2 |
2 | 0 | 0 | 2 | 124.24 | 106.85 | 117.51 |
6 | Etawah
Etawah No. of Completed Projects: 1 |
1 | 0 | 0 | 1 | 140.6 | 56.86 | 47.29 |
7 | Farrukhabad
Farrukhabad No. of Ongoing Projects: 1 No. of Under Tendering Projects: 0 |
0 | 1 | 0 | 1 | 261.12 | 181.73 | 21.49 |
8 | Firozabad
Firozabad No. of Completed Projects: 1 |
1 | 0 | 0 | 1 | 51.08 | 23.92 | 23.83 |
9 | Ghazipur
Ghazipur No. of Ongoing Projects: 1 No. of Under Tendering Projects: 0 |
0 | 1 | 0 | 1 | 152.83 | 53.6 | 9.08 |
10 | Hapur
Hapur No. of Completed Projects: 1 |
1 | 0 | 0 | 1 | 46.51 | 40.68 | 44.21 |
11 | Jaunpur
Jaunpur No. of Ongoing Projects: 1 No. of Under Tendering Projects: 0 |
0 | 1 | 0 | 1 | 206.05 | 132.89 | 122.26 |
12 | Kannauj
Kannauj No. of Completed Projects: 1 |
1 | 0 | 0 | 1 | 43.66 | 38.37 | 40.62 |
13 | Kanpur Nagar
Kanpur Nagar No. of Completed Projects: 3 No. of Ongoing Projects: 1 No. of Under Tendering Projects: 0 |
3 | 1 | 0 | 4 | 1474.92 | 711.48 | 725.19 |
14 | Kasganj
Kasganj No. of Completed Projects: 1 |
1 | 0 | 0 | 1 | 76.73 | 36.6 | 37.63 |
15 | Lucknow
Lucknow No. of Ongoing Projects: 1 No. of Under Tendering Projects: 0 |
0 | 1 | 0 | 1 | 213.91 | 101.31 | 7.9 |
16 | Mathura
Mathura No. of Completed Projects: 2 No. of Ongoing Projects: 0 No. of Under Tendering Projects: 4 |
2 | 0 | 4 | 6 | 996.27 | 689.35 | 307.75 |
17 | Meerut
Meerut No. of Ongoing Projects: 0 No. of Under Tendering Projects: 1 |
0 | 0 | 1 | 1 | 690.71 | 384.21 | 13.34 |
18 | Mirzapur
Mirzapur No. of Completed Projects: 1 No. of Ongoing Projects: 1 No. of Under Tendering Projects: 0 |
1 | 1 | 0 | 2 | 131.78 | 54.14 | 12.06 |
19 | Moradabad
Moradabad No. of Completed Projects: 1 No. of Ongoing Projects: 1 No. of Under Tendering Projects: 0 |
1 | 1 | 0 | 2 | 448.74 | 332.38 | 273.58 |
20 | Muzaffarnagar
Muzaffarnagar No. of Ongoing Projects: 2 No. of Under Tendering Projects: 0 |
0 | 2 | 0 | 2 | 282.79 | 133.42 | 89.64 |
21 | Prayagraj
Prayagraj No. of Completed Projects: 9 No. of Ongoing Projects: 1 No. of Under Tendering Projects: 0 |
9 | 1 | 0 | 10 | 2985.31 | 1524.52 | 1691.38 |
22 | Saharanpur
Saharanpur No. of Ongoing Projects: 0 No. of Under Tendering Projects: 1 |
0 | 0 | 1 | 1 | 577.23 | 266.34 | 10.27 |
23 | Shamli
Shamli No. of Ongoing Projects: 1 No. of Under Tendering Projects: 0 |
0 | 1 | 0 | 1 | 78.42 | 35.97 | 9.87 |
24 | Sultanpur
Sultanpur No. of Ongoing Projects: 1 No. of Under Tendering Projects: 0 |
0 | 1 | 0 | 1 | 70.18 | 43.68 | 33.35 |
25 | Unnao
Unnao No. of Ongoing Projects: 2 No. of Under Tendering Projects: 0 |
0 | 2 | 0 | 2 | 167.38 | 69.66 | 65.27 |
26 | Varanasi
Varanasi No. of Completed Projects: 3 No. of Ongoing Projects: 0 No. of Under Tendering Projects: 1 |
3 | 0 | 1 | 4 | 1201.93 | 886.63 | 728.9 |
Grand Total | 27 | 18 | 7 | 52 | 11872.72 | 6586.94 | 4496.2 |
S. No | Description | No. of DPRs | Name of DPRs |
---|---|---|---|
1 | Sanctioned | 5 | 4 Mathura and 1 Varanasi (Assi) |
2 | Change of scope by NMCG | 1 | 1 Prayagraj (Proposed works in the DPR for District G & F are to be included in ongoing HAM Project as per NMCG directions) |
3 | Under review at NMCG level / Submitted to NMCG by SMCG | 21 | 3 Prayagraj, 1 Varanasi, 1 Aligarh, 1 Pratapgarh (Manikpur), 1 Hathras, 3 Lucknow, 1 Raebareilly (Dalmau), 1 Bulandshahr (Gulaothi), 1 Hapur, 1 Ambedkar Nagar (Tanda), 4 Shamli, 1 Moradabad, 1 Gorakhpur (Barhalganj), and 1 Chandauli |
4 | Under review at SMCG | 0 | |
5 | Under review at UPJN (Rural) | 5 | 1 Deoband (Saharanpur), 1 Agra, 1 Kanpur, 1 Gorakhpur and 1 Dohrighat (Mau), |
Total No of DPRs to be submitted | 32 |
Sl. No. | District | Name of Project | Sanctioned cost (cr.) | No. of drains to be tapped | No. of STPs Proposed | Proposed STP Capacity (MLD) | Status |
---|---|---|---|---|---|---|---|
1 | Mathura | I & D works of balance drains for zone - III (Koyla Alipur) at Distt. Mathura | 292.56 | 4 | 1 | 60 | Sanctioned |
2 | Mathura | I & D works for Kosi Kalan NP at Distt. Mathura | 94.77 | 1 | 1 | 12 | Sanctioned |
3 | Mathura | I & D of Vrindavan town (Chaitanya Vihar , Kosi drain 1/3), at Distt. Mathura | 110.78 | 2 | 1 | 13 | Sanctioned |
4 | Mathura | I & D works for Chhata NP at Distt. Mathura | 77.59 | 11 | 1 | 6 | Sanctioned |
5 | Varanasi | I&D of Assi Nala and additional construction of STP at Ramna, Varanasi | 376.43 | 1 | 1 | 55 | Sanctioned |
6 | Chandauli | I & D and STP works at Mughalsarai town, Distt. Pt. Deen Dayal Nagar | 276.14 | 2 | 1 | 37 | Under review at NMCG level/Submitted to NMCG by SMCG. |
7 | Aligarh | I & D and STP works of Aligarh Drain at Distt. Aligarh | 814.54 | 1 | 1 | 113 | Under review at NMCG level/Submitted to NMCG by SMCG. |
8 | Lucknow | DPR for Pollution Abatement of River Gomti at Lucknow, Phase-II Part-1 | 458.05 | 3 | 1 | 50 | Under review at NMCG level/Submitted to NMCG by SMCG. |
9 | Rae Bareli | I & D & STP works at Dalmau, Distt. Raebareilly | 18.98 | 9 | 1 | 0.006 | Under review at NMCG level/Submitted to NMCG by SMCG. |
10 | Varanasi | I&D & STP works for Durga ( Lohta) drain , Distt. Varanasi | 348.86 | 1 | 1 | 55 | Under review at NMCG level/Submitted to NMCG by SMCG. |
11 | Prayagraj | I & D of 13 drains and Augmentation of Salori STP at Prayagraj (Distt. C) | 640.46 | 13 | 1 | 43 | Under review at NMCG level/Submitted to NMCG by SMCG. |
12 | Prayagraj | I & D of Rasulabad Ghat drains and augmentation of STPs at Distt. Prayagraj (distt. D) | 1193.92 | 7 | 1 | 115 | Under review at NMCG level/Submitted to NMCG by SMCG. |
13 | Hathras | I & D and STP works of Aligarh-Hathras Drain at Distt. Hathras | 179.17 | 1 | 1 | 24 | Under review at NMCG level/Submitted to NMCG by SMCG. |
14 | Prayagraj | I&D of 8 drains and STP works at Prayagraj (Distt. G) | 553.15 | 8 | 1 | 70 | Under review at NMCG level/Submitted to NMCG by SMCG. |
15 | Pratapgarh | Interception , Diversion and Treatment Works for Abatement of Pollution of River Ganga at Manikpur, Distt. Pratapgarh | 41.05 | 5 | 1 | 2.4 | Under review at NMCG level/Submitted to NMCG by SMCG. |
16 | Gorakhpur | I&D & STP works for 8 drains falling in River Rapti at Distt. Gorakhpur | 432.94 | 8 | 1 | 44 | Under review at NMCG level/Submitted to NMCG by SMCG. |
17 | Shamli | I & D works for Shamli Town Drain at Distt. Shamli | 260.53 | 1 | 1 | 40 | Under review at NMCG level/Submitted to NMCG by SMCG. |
18 | Shamli | I & D works for Banat Town Drain at Distt. Shamli | 50.45 | 2 | 1 | 4 | Under review at NMCG level/Submitted to NMCG by SMCG. |
19 | Shamli | I & D works for Thanabhawan Town Drain at Distt. Shamli | 94.94 | 3 | 1 | 8 | Under review at NMCG level/Submitted to NMCG by SMCG. |
20 | Shamli | I & D works for Babri - Bantikhera Village Drain at Distt. Shamli | 61.21 | 1 | 1 | 4 | Under review at NMCG level/Submitted to NMCG by SMCG. |
21 | Hapur | I & D works of Hapur City Drain at Distt. Hapur | 60.39 | 1 | 1 | 6 | Under review at NMCG level/Submitted to NMCG by SMCG. |
22 | Ambedkar Nagar | I&D & STP works at Tanda Town, Distt. Ambedkar Nagar | 212.36 | 8 | 1 | 15 | Under review at NMCG level/Submitted to NMCG by SMCG. |
23 | Bulandshahr | I&D & STP works for Gulaothi town, Distt. Bulandshahar | 71.76 | 1 | 1 | 10 | Under review at NMCG level/Submitted to NMCG by SMCG. |
24 | Lucknow | DPR for Pollution Abatement of River Gomti at Lucknow, Phase-III | 657.16 | 3 | 1 | 75 | Under review at NMCG level/Submitted to NMCG by SMCG. |
25 | Lucknow | DPR for Pollution Abatement of River Gomti at Lucknow, Phase-II Part-2 | 444.66 | 1 | 1 | 100 | Under review at NMCG level/Submitted to NMCG by SMCG. |
26 | Moradabad | DPR for I & D and STP works at Distt. Moradabad | 264.4 | 2 | 1 | 43 | Under review at NMCG level/Submitted to NMCG by SMCG. |
27 | Mau | I & D and STP works of drains falling in Ghaghara at NPP, Dohrighat, Distt. Mau | 64.33 | 4 | 1 | 3.50 | Pending at UPJN (Rural) |
28 | Gorakhpur | I & D and STP works at Barhalganj NP, Distt. Gorakhpur | 98.22 | 7 | 1 | 6.6 | Pending at UPJN (Rural) |
29 | Agra | Balance drains tapping & augmentation os SPS at Agra city | 78.95 | 37 | 1 | 0 | Pending at UPJN (Rural) |
30 | Kanpur Nagar | I & D of remaining 7 drains falling in river Ganga of Kanpur city | 61.48 | 7 | 1 | - | Pending at UPJN (Rural) |
31 | Saharanpur | I&D & STP works for Deoband town, Distt. Saharanpur | 132.77 | 4 | 1 | 17 | Pending at UPJN (Rural) |
32 | Prayagraj | DPR of 06 drains in Sewerage Distt.G & F at Prayagraj | 81.48 | 6 | 1 | 5.4 | Change of scope by NMCG |
Total | 8604.48 | 165 | 32 | 1036.91 |
S. No. | Description | Particulars |
---|---|---|
1 | Estimated Sewage Generation in ULBs | 5500 mld |
2 | Total number of STPs installed in the State | 119 |
3 | Total installed capacity of STPs | 3667.35 mld |
4 | STPs under construction in the State | 50 |
5 | Total capacity of STPs under construction | 962.05 mld |
5 (a) | Amrut & State Sector– 9 STPs | 277.95 mld |
5 (b) | Namami Gange – 41 STPs | 684.10 mld |
6 | STPs under tendering stage under Namami Gange Programme | 2 |
7 | Capacity STPs under tendering stage | 355 mld |
8 | Proposed STPs in 32 DPRs (under preparation) | 32 |
9 | Proposed capacity of these 32 STPs | 1036.91 mld |
10 | Sub-Total (S. No. 3 + 5 + 7 + 9) | 6021.31 mld |
District Ganga Committee (DGCs) Meeting Status |
|||
---|---|---|---|
# | River | District | No. of Meetings |
1 | Ganga | Amroha | 0 |
2 | Ballia | 0 | |
3 | Bhadohi | 1 | |
4 | Bijnor | 6 | |
5 | Budaun | 2 | |
6 | Bulandshahr | 4 | |
7 | Chandauli | 1 | |
8 | Farrukhabad | 0 | |
9 | Fatehpur | 1 | |
10 | Ghazipur | 3 | |
11 | Hapur | 2 | |
12 | Hardoi | 6 | |
13 | Kannauj | 3 | |
14 | Kanpur Nagar | 0 | |
15 | Kasganj | 1 | |
16 | Kaushambi | 1 | |
17 | Meerut | 2 | |
18 | Mirzapur | 5 | |
19 | Pratapgarh | 5 | |
20 | Prayagraj | 1 | |
21 | Rae Bareli | 0 | |
22 | Sambhal | 5 | |
23 | Shahjahanpur | 3 | |
24 | Unnao | 4 | |
25 | Varanasi | 5 | |
26 | Yamuna | Agra | 0 |
27 | Aligarh | 1 | |
28 | Auraiya | 1 | |
29 | Etah | 0 | |
30 | Etawah | 2 | |
31 | Firozabad | 2 | |
32 | Gautam Buddha Nagar | 5 | |
33 | Ghaziabad | 0 | |
34 | Jalaun | 1 | |
35 | Mathura | 0 | |
36 | Shamli | 4 | |
37 | Gomti | Amethi | 0 |
38 | Jaunpur | 1 | |
39 | Lakhimpur Kheri | 0 | |
40 | Lucknow | 1 | |
41 | Pilibhit | 6 | |
42 | Sitapur | 6 | |
43 | Sultanpur | 6 | |
44 | Ghagra | Ambedkar Nagar | 5 |
45 | Azamgarh | 7 | |
46 | Bahraich | 3 | |
47 | Barabanki | 3 | |
48 | Basti | 2 | |
49 | Gonda | 5 | |
50 | Mau | 0 | |
51 | Ram Ganga | Bareilly | 2 |
52 | Moradabad | 2 | |
53 | Rampur | 3 | |
54 | Rapti | Balrampur | 0 |
55 | Deoria | 3 | |
56 | Gorakhpur | 4 | |
57 | Siddharth Nagar | 5 | |
58 | Shrawasti | 3 | |
59 | Betwa | Jhansi | 4 |
60 | Kanpur Dehat | 3 | |
61 | Lalitpur | 1 | |
62 | Mainpuri | 3 | |
63 | Hindon | Muzaffarnagar | 8 |
64 | Saharanpur | 4 | |
65 | Gandak | Kushinagar | 4 |
66 | Maharajganj | 0 | |
67 | Dhasan | Hamirpur | 7 |
68 | Mahoba | 0 | |
69 | Aamee | Sant Kabir Nagar | 2 |
70 | Kali | Baghpat | 2 |
71 | Ken | Banda | 2 |
72 | Mandakini | Chitrakoot | 1 |
73 | Saryu | Ayodhya | 6 |
74 | Sengur | Hathras | 1 |
75 | Son | Sonbhadra | 1 |
Total | 193 |
dz-la- | ifj;kstuk dk uke | dk;Znk;h laLFkk | Bsdsnkj dk uke | foRrh; lg;ksx | dk;Z izkjEHk dh frfFk | dk;Z iw.kZ djus dh frfFk | Lohd`r ykxr ¼djksM+ esa½ | vuqcfU/kr ykxr | HkkSfrd izxfr | dqy foRrh; izxfr |
¼djksM+ esa½ | djksM+ esa | |||||||||
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 |
1 | fcBwj | Ukxj iapk;r fcBwj | eS0 fo'kky izksVsD'ku QkslZ] ubZ fnYyh | ,u0,e0lh0th | 1.06.2019 | 31.05.2022 | 2.61 | 2.58 | Completed | - |
2 | dkuiqj | Ukxj fuxe dkuiqj | eS0 fo'kky izksVsD'ku QkslZ] ubZ fnYyh | ,u0,e0lh0th | 1.06.2019 | 31.05.2022 | 3.46 | 3.4 | Completed | - |
3 | iz;kxjkt | Ukxj fuxe iz;kxjkt | eS0 fo'kky izksVsD'ku QkslZ] ubZ fnYyh | ,u0,e0lh0th | 10.06.2019 | 09.06.2022 | 3.3 | 3.29 | Completed | - |
4 | eFkqjk& o``Unkou | uxj fuxe] eFkqjk&o``Unkou | eS0 fo'kky izksVsD'ku QkslZ] ubZ fnYyh | ,u0,e0lh0th | 10.06.2019 | 09.06.2022 | 3.6 | 3.55 | Completed | - |
5 | ?kkV lQkbZ dk;Z okjk.klh | Ukxj fuxe okjk.klh | eS0 fo”kky izksVsD”ku QkslZ | ,u0,e0lh0th | 15.04.2021 | 14.04.2023 | 10 | 8.21 | Work in Progress | - |
dz-la- | ifj;kstuk dk uke | dk;Znk;h laLFkk | dkUVªSDVj@QeZ | foRrh; lg;rk | Lohd`fr dh frfFk | dk;Z izkjEHk dh frfFk | dk;Z iw.kZ djus dh frfFk | Lohd`r ykxr ¼djksM+ esa½ | vuqcfU/kr ykxr | dqy foRrh; izxfr | dqy HkkSfrd izxfr % | fVIi.kh |
¼djksM+ esa½ | ||||||||||||
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 |
1 | oUFkj] mUuko esa 4-5 ,e-,y-Mh- lh0bZ0Vh0ih0 dk mPphdj.k | BIPCC (Banthar industrial pollution control company | bZ-,e-,l-bUÝkdke izk0fyfeVsM | jk’Vªh; LoPN xaxk fe”ku | 21.02.2020 | 07-02-2022 | 06.02.2024 | 108.96 | 111.96 | dk;Z izxfr ijA | ||
2 | TkkteÅ] dkuiqj esa 20 ,e0,y0Mh0 lh0bZ0Vh0ih0 dk fuekZ.k | JTETA (Jajmau Tannery Effluent Treatment Association) | eS0 oh0,0 ckckx fyfeVsM | jk’Vªh; LoPN xaxk fe”ku | 11.02.2019 | 11.04.2019 | 10.04.2021 | 617 | dqy ykxr :0 520.14 dk;Z dh ykxr&:0 450.02, j[kj[kko dh ykxr &:0 70-12 | 235.00 Cr. | 59% | dk;Z izxfr ijA |
Revised date 02.06.2022 | ||||||||||||
3 | eFkqjk esa 6-25 ,e-,y-Mh- lh0bZ0Vh0ih0 dk mPphdj.k | MACPNL Mathura Oudhougic chetra & pradushan Nivaran company | eS0 Qrsg bUok;jks | jk’Vªh; LoPN xaxk fe”ku | 28.11.2018 | 01.08.2021 | 08 Month | 13.97 | 12.69 | 5.67 Cr. | 95% | dk;Z izxfr ijA |
4 | xksj[kiqj esa 15 ,e0,y0Mh0 ds lh0bZ0Vh0ih0 dk fuekZ.k | M/s GIDA CETP Foundation | - | jk’Vªh; LoPN xaxk fe”ku | 11.01.2022 | - | - | 93.52 | - | - | - | fnukad 11-01-2022 dks AA&ES tkjhA VsUMj MkD;wesUV cuk;k tk jgk gSA ,l-ih-oh- dk iquxZBu gsrq “kklukns”k tkjhA |
5 | Q:Z[kkckn esa | FTPPL | - | jk’Vªh; LoPN xaxk fe”ku | - | - | - | 43 | - | - | - | ;w0ih0,l0vkbZ0Mh0lh0 dks Q:Z[kkckn VSDlVkby dks Hkwfe gLrkUrfjr fd;k tkuk gSA |
1-5 ,e0,y0Mh0 lh0bZ0Vh0ih0 dk fuekZ.k | (Farrukhabad Textile park Pvt Ltd) | |||||||||||
6 | mUuko esa 2-15 ls 2-5 ,e-,y-Mh- ds lh0bZ0 Vh0ih0 dk mPphdj.k | UTPCC | - | jk’Vªh; LoPN xaxk fe”ku | 22.06.2020 | - | - | 67.88 | - | - | - | ,u-,e-lh-th- }kjk fnukad 13-08-2022 dks ,y&1 fcMj dks dk;Z vkoaVu gsrq Lohd`fr iznku dh x;hA |
(Unnao Tanners Pollution control company) |
S.no. | District | Ghat | Crematoria | ||
---|---|---|---|---|---|
Sanctioned | Completed | Sanctioned | Completed | ||
1 | Bijnaur | 1 | 1 | - | - |
2 | Mujaffarnagar | 1 | 1 | - | - |
3 | Bulandshahar | 3 | 2 | 1 | 1 |
4 | Hapur | 2 | 2 | - | - |
5 | Sambhal | 1 | 1 | - | - |
6 | Unnao | - | - | 1 | 1 |
7 | Kanpur & Bithoor | 29 | 29 | 4 | 4 |
8 | Farrukhabad | 1 | 1 | - | - |
9 | Kannauj | - | - | 1 | 1 |
10 | Fatehpur | 4 | 4 | 1 | 1 |
11 | Raibareily | 6 | 6 | - | - |
12 | Pratapgarh | 4 | 4 | 1 | 1 |
13 | Kaushambi | 3 | 3 | - | - |
14 | Prayagraj | 6 | 6 | 2 | 2 |
15 | Mizapur | 7 | 7 | 2 | 2 |
16 | Ghazipur | 1 | 1 | - | - |
Total | 69 | 69 | 13 | 13 |
Sl. No. | Project/ Town / Stretch | District | Ghat/ Crem/RFD | Location of Ghats/ Crematoriums |
---|---|---|---|---|
1 | Balwali to Bakhtawarpur | Bijnore | G-1 | Bijnore Ghat (Barrage) |
Muzzafarnagar | G-2 | Shukratal Ghat | ||
2 | Bakhtawarpur to Anupshahar | Bulandshahar | G-3 | Ravani Katiri Ghat |
Hapur | G-69 | Pooth Ghat | ||
3 | Garhmukteshwar | Hapur | G-4 | VIP Ghat |
4 | Anupshahar to Kachla (Part - I) | Sambhal | G-5 | Dhamarpura Ghat |
Bulandshahar | G-6 | Gandhi Ghat | ||
Bulandshahar | G-68 | Bhrighu Ashram Ghat | ||
5 | Anupshahar to Kachla (Part - II) | Bulandshahar | C-1 | Raj Ghat Crematorium |
6 | Kachla to Bithoor | Kanpur | G-7 | Bandimata Ghat |
Kanpur | G-8 | Bhu Kailash Ghat | ||
Kanpur | G-9 | Sarayan Ghat | ||
Kanpur | G-10 | Seng Ghat | ||
Kanpur | G-11 | Nanamau Ghat | ||
Farukkhabad | G-12 | Panchla Ghat | ||
Kanpur | C-2 | Bandi Mata Crematorium | ||
Kannauj | C-3 | Mehandi Crematorium | ||
7 | Kanpur Zone (Kanpur/Bithoor/Unnao) | Kanpur | G-13 | Gola Ghat |
Kanpur | G-14 | Sarsaiya Ghat | ||
Kanpur | G-15 | Bhairav Ghat, Kanpur | ||
Kanpur | G-16 | Guptar Ghat | ||
Kanpur | G-17 | Koyala Ghat | ||
Kanpur | G-18 | Makjain Ghat | ||
Kanpur | G-19 | Sidhnath Ghat | ||
Kanpur | G-20 | Bhagwat Das Ghat | ||
Kanpur | G-21 | Maskan Ghat | ||
Kanpur | G-22 | Parmat Ghat | ||
Kanpur | G-23 | Ganga Barrage Ghat | ||
Kanpur | C-4 | Bhairav Crematorium | ||
Kanpur | C-5 | Bhagwat Das Crematorium | ||
Kanpur | G-24 | Bhairav Ghat, Bithoor | ||
Kanpur | G-25 | Brahmavart Ghat | ||
Kanpur | G-26 | Chappar Ghat | ||
Kanpur | G-27 | Laxman Ghat | ||
Kanpur | G-28 | Mahila & Tulsi Ram Ghat | ||
Kanpur | G-29 | Pandav Ghat | ||
Kanpur | G-30 | Pathar Ghat | ||
Kanpur | G-31 | Baradari Ghat | ||
Kanpur | G-32 | Sita Ghat | ||
Kanpur | G-33 | Rani Laxmi Bai Ghat | ||
Kanpur | G-34 | Bharat Ghat | ||
Kanpur | G-35 | Kaushalya Ghat | ||
Kanpur | G-36 | Tuta Ghat | ||
Unnao | C-6 | Balu Ghat Crematorium | ||
8 | Kanpur to Prayagraj (Part - I) | Fatehpur | G-37 | Adampur Ghat |
Fatehpur | G-38 | Hajipur Ganj Ghat | ||
Fatehpur | G-39 | Ramchandra Ghat | ||
Fatehpur | G-40 | Khusurupur Ghat | ||
Unnao | G-41 | Ganga Mandir Ghat | ||
Rae Bareli | G-42 | Sarak Ghat | ||
Rae Bareli | G-43 | VIP Ghat | ||
Rae Bareli | G-44 | Rani Shivala Ghat | ||
Rae Bareli | G-45 | Sankat Mochan Ghat | ||
Rae Bareli | G-46 | Mahabiran Ghat | ||
Kanpur | C-7 | Dhonri Crematorium | ||
9 | Kanpur to Prayagraj (Part - II) | Pratapgarh | G-47 | Amethi |
Pratapgarh | G-48 | Ramjanaki | ||
Pratapgarh | G-49 | Saraswati | ||
Pratapgarh | G-50 | Kila tat Pakka Ghat | ||
Kaushambi | G-51 | Karra Dhab Ghat | ||
Kaushambi | G-52 | Asadpur Ghat | ||
Kaushambi | G-53 | Badanpur Ghat | ||
Prayagraj | G-54 | Ramchaura Ghat | ||
Fatehpur | C-8 | Mainpuri Crematorium | ||
Pratapgarh | C-9 | Manikpur Crematorium | ||
10 | Prayagraj | Prayagraj | G-55 | Rasulabad Ghat |
Prayagraj | G-56 | Kali Maa Ghat | ||
Prayagraj | G-57 | Gau Ghat | ||
Prayagraj | G-58 | Balua Ghat | ||
Prayagraj | G-59 | Bargat Ghat | ||
Prayagraj | C-10 | Rasulabad | ||
Prayagraj | C-11 | Kanhaiyapur | ||
11 | Mirzapur | Mirzapur | G-60 | Nar Ghat |
Mirzapur | G-61 | Pakka Ghat | ||
Mirzapur | G-62 | Gangaram Ghat | ||
Mirzapur | G-63 | Oliyur Ghat | ||
Mirzapur | G-64 | Bariya Ghat | ||
Mirzapur | G-65 | Kacheri Ghat | ||
Mirzapur | G-66 | Gau Ghat | ||
Mirzapur | C-12 | Ganjia Crematorium | ||
Mirzapur | C-13 | Chauba Crematorium | ||
12 | Ghazipur | Ghazipur | G-67 | Mahadev Ghat |
Total Project Sanctioned in State | 11 |
---|---|
Total Cost | 181.1622 Crores |
Project Completed | 06 |
Total sapling planted | 47.69973 Lakhs in 8820 ha. area sapling planted in 27 Forest Divisions of Ganga and 10 Gomti River. |
Project Executive Agency | Environment, Forest and Climate Change Department, Uttar Pradesh |
S.N. | Name of Project | Executive Agency | Sanctioned cost (Cr.) |
---|---|---|---|
1-7 | Forestry Intervention for Ganga- Year of APO: 2016-2017, (Completed) 2017-2018, (Completed) 2018-2019, (Completed) 2019-2020, (Completed) 2020-2021, (Completed) 2021-2022 and (Ongoing) 2022-2023 (Ongoing) | Environment, Forest and Climate Change Department, Uttar Pradesh | 98.4144 |
8 | Plantation in 1010 Ganga Gram of Uttar Pradesh via water and sanitation Department (Ongoing) Year of Sanctioned= 2018-2020 and 2021-22 | 40 | |
9 | Promotion of Cultivation of Medicinal Plants on Ganga Basin in Uttar Pradesh | 35.46 | |
10 | Expanding conservation breeding Programme of freshwater turtles & gharial at Kukrail Gharial Rehabilitation Centre, Lucknow (Ongoing) | 3.13 | |
11 | Conserving and sustainably Managing Gangetic Floodplain Wetlands of Uttar Pradesh (Completed, Final report awaited) | U.P. State Wetlands Authority | 4.1578 |
Above Project Sanctioned to UP State | Total Cost= | 181.1622 |
S.No | Description of OA | View Details |
---|---|---|
1 | OA No. 200 of 2014-M.C. Mehta Vs Union of India &Others. | View Details |
2 | OA No. 06/2012 Manoj Misra Vs. Uot (Yammuna). | View Details |
3 | Original Application No. 673/2018 (M.A. No. 1777/2018) New item published in “The Hindu” authored by shri Jacob Koshy titled “More river stretches are now critically polluted” CPCB. | View Details |
4 | O.A.No. 593/2017 (Paryavaram Suraksha Samiti & Anr. Vs Union of India & Ors.) | View Details |
5 | O.A. No. 606/2018 Hon’ble NGT compliance of Municipal Solid Waste Management Rules. | View Details |
6 | OA No. 116/2014 with OA 437/2015 in Meera Shukla Vs Municipal Corporation, Gorakhpur & Others with Re Vishwa Vijay Singh Vs. U.P. Pollution Control Board & Others. | View Details |
7 | Matter No. 13029/1985, MC Mehta & Union of India & Others | - |
8 | O.A. No. 985/2019 with O.A. No. 986/2019 | View Details |
9 | O.A. No. 490/2019 (Ts Singh Vs State of U.P. and Ors). | View Details |
10 | O.A. No. 325/2015-Water Bodies Restoration. | View Details |
11 | O.A. No. 65/2020-Water Bodies Ghaziabad. | View Details |
12 | O.A. No. 156/2015 & OA No. 384/2019 Ms. Sunita Pandey & Anr. Vs Union of India &Others. | View Details |
13 | O.A No. 804/2017, (Rajiv Narayan & Ors. Vs Union of India &Others. | View Details |
14 | O.A. No. 621 of 2018 (Mahendra pandey Vs Union of India &Others.) | View Details |
15 | O.A. No. 380/2018 (Park Avenue Plot Holder Welfare Society & Anr. Vs Union of India &Others.) | - |
16 | O.A. No. 681/2018 (In the matter of News Item published in the “ Time of India” authored by Shri Vishwa Mohan Titeled “NACP with Multiple Timeline to clear Air in 102 Cities to be released around August 15”. | View Details |
17 | O.A. No. 16/2014 & OA 437/2015 in Meera Shukla Vs U.P. Govt. & Others | View Details |
Chart Legends: ![]() |
क्र.सं- | योजना का नाम | STP Capacity (MLD) | No. of SPS | Sewer Line (KM) | No. of I&D Works | No. of NHAI Issues Reported | Overall Progress | वित्त पोषण | AA&ES and date | Date of start as per agreement | Expected date of completion | Previous Progress | Weekly Progress | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Physical Progress | Financial Progress | Physical Progress | Financial Progress | Physical Progress | Financial Progress | |||||||||||||||||||
Upto 08.10.2022 |
(रु0 करोड़ मेें) Upto 08.10.2022 |
(in Percentage as per Sanction Cost) Upto 08.10.2022 |
Sanction cost | Work Cost | Centage | O& M Cost ( 5/10/15 Years) | Sanction date | As per AAES | As per Agreement | Extended date | Upto 01.10.2022 (Total) | Upto 01.10.2022 (Total) |
01.10.2022 08.10.2022 (Total) |
01.10.2022 08.10.2022 (Total) |
||||||||||
प्रगति में चल रही योजनाएं | ||||||||||||||||||||||||
|
1 | शुक्लागंज, उन्नाव में आई.एण्ड डी. एवं एस.टी.पी. के कार्य ( HAM पी.पी.पी. आधारित) | 5 MLD | 1 No. | 0.1 KM | 0 No. | 0 | 60.00% | 16.44 | 25.22% | नमामि गंगे | 65.1800 | 25.9300 | 1.9000 | 37.3500 | 28.07.17 | 11.10.2019 | फरवरी-2020 | अक्टूबर-2021 | 60.00% | 16.44 | 0.0 % | 0.0 | |
Remarks: कार्य प्रगति पर। ( Expenditure Including NMCG+ SPV release) | ||||||||||||||||||||||||
|
2 | उन्नाव नगर में आई.एण्ड डी. एवं एस.टी.पी. के कार्य ( HAM पी.पी.पी. आधारित) | 15 MLD | 1 No. | 3.2 KM | 0 No. | 0 | 93.50% | 48.83 | 47.78% | नमामि गंगे | 102.2000 | 43.7300 | 3.2200 | 55.2500 | 28.07.17 | 11.10.2019 | अपै्रल-2020 | अक्टूबर-2021 | 93.50% | 48.83 | 0.00% | 0.0 | |
Remarks: कार्य प्रगति पर। ( Expenditure Including NMCG+ SPV release) | ||||||||||||||||||||||||
|
3 | कानपुर नगर निर्मित STP के पुनरोद्धार,पनखा में I&D STP निर्माण,15Yr O&M(HAMPPP) | 30 MLD | 3 No. | 16 KM | 0 No. | 0 | 94.50% | 203.13 | 21% | नमामि गंगे | 967.2300 | 248.3900 | 0.0000 | 718.8400 | 12.03.18 | 11.10.2019 | मार्च-2020 | अक्टूबर-2021 | 94.25% | 203.13 | 0.25 % | 0.0 | |
Remarks: कार्य प्रगति पर। ( Expenditure Including NMCG+ SPV release) | ||||||||||||||||||||||||
|
4 | नैनी, फाफामऊ,झूसी क्षेत्र प्रयागराज में I&D एवं STP के कार्य ( HAM PPP) | 72 MLD | 7 No. | 21.13 KM | 0 No. | 0 | 94.08% | 255.93 | 33.34% | नमामि गंगे | 767.6000 | 280.1400 | 21.6700 | 465.7900 | 19.05.17 | 16.09.2019 | मई-2020 | सितम्बर-2021 | 93.51 % | 255.93 | 0.57% | 0.0 | |
Remarks: कार्य प्रगति पर। ( Expenditure Including NMCG+ SPV release) | ||||||||||||||||||||||||
|
5 | सुल्तानपुर नगर, में आई एण्ड डी. एवं एस.टी.पी. के कार्य | 12 MLD | 2 No. | 1.92 KM | 0 No. | 0 | 95.00 % | 37.82 | 53.89% | नमामि गंगे | 70.1800 | 43.6778 | 2.5922 | 23.9100 | 04.12.2019 | 30.11.2019 | दिसम्बर-2020 | नवम्बर-2021 | 94.95% | 37.82 | 0.05% | 0.0 | |
Remarks: कार्य प्रगति पर। | ||||||||||||||||||||||||
|
6 | जौनपुर नगर, में आई एण्ड डी. एवं एस.टी.पी. के कार्य | 30 MLD | 4 No. | 8.39 KM | 0 No. | 0 | 98.00% | 122.26 | 59.34% | नमामि गंगे | 206.0500 | 132.8900 | 9.2536 | 63.9100 | 12.02.2019 | 21.10.2019 | फरवरी-2021 | अक्टूबर-2021 | 98.00% | 122.26 | 0.00% | 0.0 | |
Remarks: Main component completed and STP has been Commissioned. | ||||||||||||||||||||||||
|
7 | बागपत नगर, में आई एण्ड डी. एवं एस.टी.पी. के कार्य | 14 MLD | 1 No. | 2.325 KM | 0 No. | 0 | Under Trail &Run | 28.66 | 37.05% | नमामि गंगे | 77.3600 | 38.7200 | 2.6616 | 35.9800 | 19.02.2019 | 8.01.2020 | फरवरी-21 | अप्रैल -2021 | Under Trail &Run | 28.66 | Under trail &Run | 0.0 | |
Remarks: Main component completed and STP has been Commissioned. | ||||||||||||||||||||||||
|
8 | मुज्जफर नगर, के सीवरेज योजनाओं के पुनरोद्धार का कार्य ( HAM पी.पी.पी. आधारित) | 54.5 MLD | 3 No. | 4.47 KM | 0 No. | 0 | 67.94 % | 94.190 | 40.25% | नमामि गंगे | 234.0300 | 108.3200 | 7.3300 | 118.3800 | 02.01.2019 | 04.10.2020 | जनवरी-2021 | 67.34 % | 94.19 | 0.60 % | 0.0 | ||
Remarks: कार्य प्रगति पर। | ||||||||||||||||||||||||
|
9 | बुड़ाना नगर, में आई एण्ड डी. एवं एस.टी.पी. के कार्य ( HAM पी.पी.पी. आधारित) | 10 MLD | 1 No. | 0.8 KM | 0 No. | 0 | 77.44 % | 19.50 | 39.99% | नमामि गंगे | 48.7600 | 25.1000 | 1.7000 | 21.9600 | 18.02.2019 | 04.10.2020 | फरवरी-2021 | 77.04 % | 19.50 | 0.40 % | 0.0 | ||
Remarks: कार्य प्रगति पर। | ||||||||||||||||||||||||
|
10 | मुरादाबाद नगर, में आई एण्ड डी. एवं एस.टी.पी. के कार्य ( HAM पी.पी.पी. आधारित) | 25 MLD | 2 No. | 4.01 KM | 0 No. | 0 | 0.00% | 1.76 | 1.48% | नमामि गंगे | 118.6900 | 53.5300 | 3.5200 | 61.6400 | 23.07.18 | 29.02.2020 | जुलाई-2020 | 0.00% | 1.76 | 0.00% | 0.00 | ||
Remarks: Land issue has been resolved. Financial arrangement under process. Effective date of start will be issued after completion of financial arrangement. | ||||||||||||||||||||||||
|
11 | लखनऊ नगर, में आई एण्ड डी. एवं एस.टी.पी. के कार्य | 40 MLD | 1 No. | 0 KM | 0 No. | 0 | 9.00% | 7.90 | 3.69% | नमामि गंगे | 213.9100 | 101.3100 | 6.9700 | 105.6300 | 02.03.2019/06.05.2020 | 17.09.2020 | मार्च-2021 | 9.00% | 7.90 | 0.0% | 0.0 | ||
Remarks: कार्य प्रगति पर। | ||||||||||||||||||||||||
|
12 | फर्रूखाबाद-फतेहगढ़ में आई.एण्ड डी. एवं एस.टी.पी. के कार्य ( HAM पी.पी.पी. आधारित) | 45 MLD | 0 No. | 0 KM | 0 No. | 0 | 16.00% | 21.49 | 8.23% | नमामि गंगे | 261.12 | 181.73 | 6.9800 | 72.41 | 16.10.17/12.01.2021 | 24.12.2020 | अक्टूबर -2019 | 14.00% | 21.49 | 2.0% | 0.0 | ||
Remarks: कार्य प्रगति पर। | ||||||||||||||||||||||||
|
13 | गाजीपुर में आई.एण्ड डी. एवं एस.टी.पी. के कार्य ( HAM पी.पी.पी. आधारित) | 21 MLD | 1 No. | 8.7 KM | 0 No. | 0 | 27.50% | 9.08 | 5.94% | नमामि गंगे | 152.8300 | 53.5973 | 3.0627 | 96.1700 | 16.11.2017 / 06.05.2020 | 20.02.2021 | दिसम्बर-2019 | 25.50 % | 9.08 | 2.0% | 0.0 | ||
Remarks: कार्य प्रगति पर। | ||||||||||||||||||||||||
|
14 | मिर्जापुर में आई.एण्ड डी. एवं एस.टी.पी. के कार्य ( HAM पी.पी.पी. आधारित) | 17 MLD | 3 No. | 5.01 KM | 0 No. | 0 | 32.50% | 10.08 | 7.81% | नमामि गंगे | 129.0800 | 51.9825 | 4.0400 | 73.0500 | 14.11.2017/ 28.05.2020 | 20.02.2021 | फरवरी-2020 | 32.00% | 10.08 | 0.50% | 0.0 | ||
Remarks: कार्य प्रगति पर। | ||||||||||||||||||||||||
|
15 | बरेली नगर, में आई एण्ड डी. एवं एस.टी.पी. के कार्य ( HAM पी.पी.पी. आधारित) | 63 MLD | 1 No. | 16.39 KM | 0 No. | 0 | 8.33% | 5.35 | 1.97% | नमामि गंगे | 271.3900 | 139.4400 | 10.7000 | 121.2500 | 03.01.2019 | जनवरी-2021 | 8.33% | 5.35 | 0.0% | 0.00 | |||
Remarks: कार्य प्रगति पर। | ||||||||||||||||||||||||
|
16 | आगरा नगर, के सीवरेज योजनाओं के पुनरोद्धार एवं 15 वर्षों का रखरखाव के कार्य ( HAM पी.पी.पी. आधारित) | 177.6 MLD | 0 No. | 0 KM | 0 No. | 0 | 0.00% | 12.70 | 1.51% | नमामि गंगे | 842.2500 | 371.29 | 25.40 | 445.56 | 24.12.2018/ 06.05.2020 | अनुबन्ध के दिनांक से 02 वर्ष तक पूर्ण करना है। | 0% | 12.70 | 0% | 0.00 | |||
Remarks: LOA has been issued to M/s Vishvraj Environment Private Limited, Mumbai JV M/s Vishvaraj Infrastr ucter Limited, Mumbai on 15.06.2022. Contract Agreement has been signed on 25.08.2022. Financial arrangement under process. | ||||||||||||||||||||||||
|
17 | कैराना नगर, में आई एण्ड डी. एवं एस.टी.पी. के कार्य | 15 MLD | 1 No. | 0 KM | 0 No. | 0 | 50.31% | 13.50 | 17.21% | नमामि गंगे | 78.42 | 35.9700 | 3.9400 | 38.5100 | 07.12.2020 | दिसम्बर-2022 | 50.17 % | 13.50 | 0.14 % | 0.0 | |||
Remarks: कार्य प्रगति में। | ||||||||||||||||||||||||
|
18 | फैजाबाद नगर, जनपद अयोध्या में आई.एण्ड.डी एवं एस.टी.पी. के कार्य (HAM आधारित) | 33 MLD | 0 No. | 4.06 KM | 0 No. | 0 | 0.00% | 3.81 | 1.72% | नमामि गंगे | 221.66 | 116.65 | 3.9400 | 105.01 | 06.05.2021 | अप्रैल-2023 | 0% | 3.81 | 0% | 0.00 | |||
Remarks: LOA issued to M/s ECO Protection Engineers Private Limited,Annanagar,Chennai on 30.12.2021. Concessionaire agreement was signed on 11.04.2022. Financial arrangement is under process. | ||||||||||||||||||||||||
टेन्डर प्रकिया में चल रही योजनाएं | ||||||||||||||||||||||||
19 | मेरठ नगर, में आई एण्ड डी. एवं एस.टी.पी. के कार्य (HAM पी.पी.पी. आधारित) | 220 MLD | 0 No. | 0 KM | 0 No. | 0 | 0.00% | 13.34 | 1.93% | नमामि गंगे | 690.7100 | 384.2100 | 26.3100 | 280.1900 | 19.02.2019/06.05.2020 | फरवरी-2021 | 0% | 13.34 | 0% | 0.00 | ||||
Remarks: Financial bid evaluation report submitted to NMCG on 14.10.2022.. World Bank has sought some Clarification on Evaluation report vide email dated 02.12.22 | ||||||||||||||||||||||||
20 | सहारनपुर नगर, में आई एण्ड डी. एवं एस.टी.पी. के कार्य (HAM पी.पी.पी. आधारित) | 135 MLD | 0 No. | 0 KM | 0 No. | 0 | 0.00% | 10.27 | 1.78% | नमामि गंगे | 577.23 | 266.3400 | 20.5500 | 290.3400 | 15.06.2022 | 0% | 10.27 | 0% | 0.00 | |||||
Remarks: AA & ES issued by NMCG on 16.06.2022. Bids have been invited on 02.01.2023 and will be opened on 02.01.2023. | ||||||||||||||||||||||||
21 | मथुरा नगर में अवशेष नालों के आई.एण्ड डी. एवं एस.टी.पी. के कार्य का पुनरोद्धार एवं क्षमता उच्चीकरण का कार्य (HAM पी.पी.पी. आधारित) | 60 MLD | 3 No. | 9.29 KM | 0 No. | 0 | 0% | नमामि गंगे | 292.56 | 292.56 | 292.56 | 292.56 | ||||||||||||
Remarks: AA & ES issued by NMCG on 07.09.2022. Bid is invited and it will be opened on 09.01.2023 | ||||||||||||||||||||||||
22 | अस्सी-वी.एच.यू. क्षेत्र वाराणसी हेतुु नालेेा के आई.एण्ड डी. एवं एस.टी.पी. कार्य | 85 MLD | 4 No. | 11.76 KM | 0 No. | 0 | 0% | नमामि गंगे | 308.09 | 127.34 | 7.81 | 172.94 | 19.10.2022 | |||||||||||
Remarks: AA & ES issued by NMCG on 19.10.2022 . Bid have been invited on 03.01.2023 and will be opened on 04.01.2023. | ||||||||||||||||||||||||
23 | छाता नगर, जनपद मथुरा, में आई एण्ड डी. एवं एस.टी.पी. के कार्य | 20 MLD | 2 No. | 10.68 KM | 0 No. | 0 | 0% | नमामि गंगे | 56.15 | 34.5200 | 2.2200 | 19.4100 | 25.10.2022 | |||||||||||
Remarks: AA & ES issued by NMCG on 25.10.2022. Bid is invited and it will be opened on 03.01.2023. | ||||||||||||||||||||||||
24 | कोसाीकला नगर, जनपद मथुरा, में आई एण्ड डी. एवं एस.टी.पी. के कार्य | 0 MLD | 2 No. | 111.35 KM | 0 No. | 0 | 0% | नमामि गंगे | 66.59 | 31.2300 | 2.0300 | 33.3300 | 25.10.2022 | |||||||||||
Remarks: AA & ES issued by NMCG on 25.10.2022. Bid is invited and it will be opened on on 03.01.2023. | ||||||||||||||||||||||||
25 | वत्त्दावन नगर, जनपद मथुरा, में आई एण्ड डी. एवं एस.टी.पी. के कार्य | 14 MLD | 1 No. | 0 KM | 0 No. | 0 | 0% | नमामि गंगे | 77.70 | 39.9000 | 2.5600 | 35.2400 | 15.10.2022 | |||||||||||
Remarks: AA & ES issued by NMCG on 15.10.2022. Bid is invited and it will be opened on 03.01.2023 | ||||||||||||||||||||||||
पूर्ण योजनाएं | ||||||||||||||||||||||||
26 | सीवरेज एण्ड नाॅन सीवरेज योजना, प्रयागराज, डिस्ट्रिक्ट-बी, ई | 0 MLD | 0 No. | 46.13 KM | 0 No. | 0 | पूर्ण | 175.48 | 84.61% | नाॅन ई.ए.पी. | 207.39 | 187.53 | 19.8600 | 0.0000 | 06.05.10 | 27.4.2015 | फरवरी-2013 | मार्च-2016 | पूर्ण | 175.48 | पूर्ण | 0.00 | ||
Remarks: कार्य पूर्ण | ||||||||||||||||||||||||
27 | सीवरेज एण्ड नाॅन सीवरेज योजना, प्रयागराज, डिस्ट्रिक्ट-ए | 13 MLD | 1 No. | 52.5 KM | 0 No. | 0 | पूर्ण | 89.07 | 90.93% | ई.ए.पी. | 97.95 | 97.95 | 0.0000 | 0.0000 | 06.05.10 | 8.12.2010 | फरवरी-2013 | मार्च-2016 | पूर्ण | 89.07 | पूर्ण | 0.00 | ||
Remarks: कार्य पूर्ण | ||||||||||||||||||||||||
28 | सीवरेज योजना, डिस्ट्रिक्ट-ई, प्रयागराज | 4 MLD | 1 No. | 25.57 KM | 0 No. | 0 | पूर्ण | 138.25 | 97.36% | ई.ए.पी. | 142.0000 | 126.7000 | 6.5700 | 8.7300 | 22.02.11 | 6.11.2011 | फरवरी-2013 | जून-2016 | पूर्ण | 138.25 | पूर्ण | 0.00 | ||
Remarks: कार्य पूर्ण | ||||||||||||||||||||||||
29 | 14 एम.एल.डी. एस.टी.पी. सलोरी, प्रयागराज | 9 MLD | 2 No. | 65 KM | 0 No. | 0 | पूर्ण | 34.93 | 82.38% | ई.ए.पी. | 42.4000 | 23.7706 | 1.9016 | 16.7246 | 27.11.13 | 6.12.2011 | फरवरी-2016 | सितम्बर-2016 | पूर्ण | 34.93 | पूर्ण | 0.00 | ||
Remarks: कार्य पूर्ण | ||||||||||||||||||||||||
30 | सीवरेज नेटवर्क डिस्ट्रिक्ट-ई, प्रयागराज (अति. कार्य) | 2.5 MLD | 2 No. | 58.87 KM | 0 No. | 0 | पूर्ण | 50.43 | 95.55% | ई.ए.पी. | 52.7800 | 48.9000 | 3.8800 | 0.0000 | 28.09.16 | 10.4.2017 | सितम्बर-2016 | अप्रैल-2018 | पूर्ण | 50.43 | पूर्ण | 0.00 | ||
Remarks: कार्य पूर्ण | ||||||||||||||||||||||||
31 | सीवरेज परियोजना, कन्नौज | 0 MLD | 2 No. | 136.73 KM | 0 No. | 0 | पूर्ण | 40.62 | 93.04% | नाॅन ई.ए.पी. | 43.6600 | 38.3700 | 3.0300 | 2.2600 | 24.02.11 | 20.09.2011 | अगस्त-2012 | मार्च-2018 | पूर्ण | 40.62 | पूर्ण | 0.00 | ||
Remarks: कार्य पूर्ण 13 से 14 एम.एल.डी. श्राव शोधित किया जा रहा है | ||||||||||||||||||||||||
32 | सीवरेज योजना, नरोरा, बुुलन्दशहर | 0 MLD | 1 No. | 202.57 KM | 0 No. | 0 | पूर्ण | 47.69 | 98.43% | ई.ए.पी. | 48.4500 | 39.7300 | 2.2600 | 6.4600 | 04.03.14/ 09.05.2018 | 15.6.2015 | मई-2018 | मार्च-2018 | पूर्ण | 47.69 | पूर्ण | 0.00 | ||
Remarks: कार्य पूर्ण | ||||||||||||||||||||||||
33 | सीवरेज योजना, गढ़मुक्तेश्वर | 0 MLD | 3 No. | 0 KM | 0 No. | 0 | पूर्ण | 44.21 | 95.05% | नाॅन ई.ए.पी. | 46.5100 | 40.6800 | 3.2500 | 2.5800 | 24.02.11 | 7.9.2011 | अगस्त-2013 | अगस्त-2013 | पूर्ण | 44.21 | पूर्ण | 0.00 | ||
Remarks: कार्य पूर्ण 0.7 एवं 3.5 एम.एल.डी. श्राव शोधित किया जा रहा है | ||||||||||||||||||||||||
34 | सीवरेज अपग्रेडेशन का कार्य, अनूपशहर, बुलन्दशहर | 0 MLD | 3 No. | 215.71 KM | 0 No. | 0 | पूर्ण | 69.82 | 92.12% | ई.ए.पी. | 75.7900 | 67.1200 | 5.2700 | 3.4000 | 19.05.14 | 9.1.2016 | मई-2017 | सितम्बर-2018 | पूर्ण | 69.82 | पूर्ण | 0.00 | ||
Remarks: कार्य पूर्ण 1.2 एवं 0.6 एम.एल.डी. श्राव शोधित किया जा रहा है | ||||||||||||||||||||||||
35 | सीवरेज योजना, डिस्ट्रिक्ट-सी, प्रयागराज | 0 MLD | 0 No. | 1.09 KM | 0 No. | 0 | पूर्ण | 164.65 | 96.31% | ई.ए.पी. | 170.9500 | 154.0090 | 9.8685 | 7.0725 | 27.11.13/ 13.09.2019 | 07.4.2015 | सितम्बर-2016 | अक्टूबर-2018 | पूर्ण | 164.65 | पूर्ण | 0.0 | ||
Remarks: कार्य पूर्ण। योजना की पर्व स्वीकृत लागत रू. 146.87 करोड है। एन.एम.सी.जी. के पत्र दिनांक 13.11.2019 के द्वारा रू. 170.9499 करोड़ की पुनरीक्षित जारी की गयी जिसमें अतिरिक्त कार्य- 23500 नग सीवर हाउस कनेक्शन माह, जून-2020 तक किया जाना प्रस्तावित है। उक्त प्रस्तावित 23500 नग सीवर हाउस कनेक्शन के सापेक्ष 22550 पूर्ण किये जा चुके है। | ||||||||||||||||||||||||
36 | सीवरेज योजना, डिस्ट्रिक्ट-बी, प्रयागराज | 130 MLD | 0 No. | 0 KM | 0 No. | 0 | पूर्ण | 293.02 | 97.4% | ई.ए.पी. | 300.8425 | 278.2669 | 18.8158 | 3.7598 | 31.12.14/ 11.11.2019 | 25.6.2016 | दिसम्बर-2017 | दिसम्बर-2018 | पूर्ण | 293.02 | पूर्ण | 0.0 | ||
Remarks: कार्य पूर्ण। योजना की पर्व स्वीकृत लागत रू. 265.86 करोड है। एन.एम.सी.जी. के पत्र दिनांक 11.11.2019 के द्वारा रू. 300.8425 करोड़ की पुनरीक्षित जारी की गयी जिसमें अतिरिक्त कार्य- 25000 नग सीवर हाउस कनेक्शन माह, जून-2020 तक किया जाना प्रस्तावित है। उक्त प्रस्तावित 25000 नग सीवर हाउस कनेक्शन के सापेक्ष 27500 पूर्ण किये जा चुके है। रू0 5.57 करोड़ भुगतान प्राइस एडजेस्टमेन्ट मद में। | ||||||||||||||||||||||||
37 | इन्टरसेप्शन एण्ड डायवर्जन नाला, सीसामऊ, कानपुर | 0 MLD | 0 No. | 2.3 KM | 0 No. | 0 | पूर्ण | 60.36 | 94.61% | नमामि गंगे | 63.8000 | 57.6400 | 4.6100 | 1.5500 | 03.10.16 | 23.5.2017 | अप्रैल -2018 | अक्टूबर-2018 | पूर्ण | 60.36 | पूर्ण | 0.00 | ||
Remarks: कार्य पूर्ण। | ||||||||||||||||||||||||
38 | सीवरेज योजना, डिस्ट्रिक्ट-ए, प्रयागराज | 58 MLD | 10 No. | 233.25 KM | 0 No. | 0 | पूर्ण | 285.67 | 95.42% | ई.ए.पी. | 299.3956 | 269.1072 | 19.7504 | 10.5380 | 20.02.14/ 11.11.2019 | 27.4.2015 | नवम्बर-2017 | अप्रैल -2018 | पूर्ण | 285.67 | पूर्ण | 0.0 | ||
Remarks: योजना की पर्व स्वीकृत लागत रू. 288.947 करोड है। एन.एम.सी.जी. के पत्र दिनांक 11.11.2019 के द्वारा रू. 299.3956 करोड़ की पुनरीक्षित जारी की गयी जिसमें अतिरिक्त कार्य-26000 नग सीवर हाउस कनेक्शन माह, जून-2020 तक किया जाना प्रस्तावित है। उक्त प्रस्तावित 26000 नग सीवर हाउस कनेक्शन के सापेक्ष 26000 पूर्ण किये जा चुके है। रू0 6.71 करोड़ भुगतान प्राइस एडजेस्टमेन्ट मद में। | ||||||||||||||||||||||||
39 | अयोध्या नगर, जनपद-अयोध्या में आई एण्ड डी. के निर्माण कार्य | 140 MLD | 3 No. | 27.62 KM | 0 No. | 0 | पूर्ण | 16.82 | 44.65% | नमामि गंगे | 37.6700 | 16.2500 | 1.0955 | 20.3200 | 11.06.18 | 17.11.2018 | नवम्बर-2019 | दिसम्बर-2019 | पूर्ण | 16.82 | पूर्ण | 0.0 | ||
Remarks: कार्य पूर्ण। | ||||||||||||||||||||||||
40 | बिठूर नगर कानपुर में आई.एण्ड डी.एवं एस.टी.पी. के कार्य | 0 MLD | 4 No. | 102.92 KM | 0 No. | 0 | पूर्ण | 10.03 | 74.85% | नमामि गंगे | 13.4000 | 10.2500 | 0.7000 | 2.4500 | 10.10.17 | 20.9.2018 | अप्रैल -2018 | दिसम्बर-2019 | पूर्ण | 10.03 | पूर्ण | 0.00 | ||
Remarks: कार्य पूर्ण। | ||||||||||||||||||||||||
41 | वृन्दावन, मथुरा में नवीनीकरण एवं उच्चीकरण का कार्य | 50 MLD | 1 No. | 0 KM | 0 No. | 0 | पूर्ण | 20.70 | 48.34% | नमामि गंगे | 42.8200 | 26.7400 | 1.1900 | 14.8900 | 29.03.17 /07.05.18/ 11.12.2019 | 1.12.2018 | मार्च-2018 | फरवरी-2020 | पूर्ण | 20.70 | पूर्ण | 0.0 | ||
Remarks: कार्य पूर्ण। | ||||||||||||||||||||||||
42 | रामगंगा सीवरेज परियोजना, मुरादाबाद | 10 MLD | 0 No. | 0.8 KM | 0 No. | 0 | पूर्ण | 275.76 | 83.55% | नाॅन EAP | 330.0500 | 278.8500 | 19.0300 | 32.1700 | 24.02.11/ 31.07.2020 | 21.10.2011 | फरवरी-2014 | अप्रैल-2013 | पूर्ण | 275.76 | पूर्ण | 0.0 | ||
Remarks: STP/SPS are commissioned. Hydro testing in some part of sewer line is in progress. | ||||||||||||||||||||||||
43 | जायका सहायतित सीवरेज योजना, वाराणसी | 30 MLD | 8 No. | 24.47 KM | 0 No. | 0 | पूर्ण | 596.01 | 90.36% | जायका | 659.6200 | 633.4100 | 26.2100 | 0.0000 | 14.07.10/ 23.07.2020 | 10.1.2013 | जुलाई-2015 | मई-2017 | पूर्ण | 596.01 | पूर्ण | 0.00 | ||
Remarks: कार्य प्रगति पर योजना में नाॅन सीवरेज कम्पोनेन्ट को व्यय सम्मिलित करते हुए। Desilting and lining work Completed. | ||||||||||||||||||||||||
44 | सीवरेज योजना सीवरेज डिस्ट्रिक्ट-1, कानपुर | 0 MLD | 0 No. | 0 KM | 0 No. | 0 | पूर्ण | 456.41 | 106.02% | ई.ए.पी. | 430.4900 | 395.2000 | 23.8100 | 11.4800 | 18.10.16/ 10.12.2019 | 17.8.2017 | जुलाई-2020 | अगस्त-2020 | पूर्ण | 456.41 | पूर्ण | 0.0 | ||
Remarks: Under O&M. रू0 43.53 करोड़ भुगतान प्राइस एडजेस्टमेन्ट मद में। | ||||||||||||||||||||||||
45 | रमना वराणसी में 50MLD क्षमता के STP का निर्माण एवं रख-रखाव का कार्य। (HAM PPP) | 21 MLD | 0 No. | 2.478 KM | 0 No. | 0 | पूर्ण | 122.23 | 75.77% | नमामि गंगे | 161.3100 | 102.0000 | 8.1600 | 51.1500 | 23.12.2016/21.09.2017 | 19.02.2018 | दिसम्बर-2019 | नवम्बर-2019 | पूर्ण | 122.23 | पूर्ण | 0.0 | ||
Remarks: Under O&M. ( Expenditure Including NMCG+ SPV release) | ||||||||||||||||||||||||
46 | रामनगर,वाराणसी में आई.एण्ड डी.एवं एस.टी.पी.के कार्य | 15 MLD | 1 No. | 2.675 KM | 0 No. | 0 | पूर्ण | 26.32 | 36.1% | नमामि गंगे | 72.9100 | 23.8800 | 1.7500 | 47.2800 | 28.07.17 | 1.12.2018 | दिसम्बर-2019 | August- 2020 | पूर्ण | 26.32 | पूर्ण | 0.0 | ||
Remarks: Under O& M | ||||||||||||||||||||||||
47 | मथुरा नगर में I&D एवं STP के कार्य का पुनरोद्धार एवं क्षमता उच्चीकरण (HAM PPP) | 0.01 MLD | 0 No. | 0 KM | 0 No. | 0 | पूर्ण | 295.23 | 64.12% | नमामि गंगे | 460.4500 | 264.4000 | 8.7800 | 187.2700 | 11.06.18 | 15.1.2019 | जून-2020 | जनवरी-2021 | पूर्ण | 295.23 | पूर्ण | 0.0 | ||
Remarks: I&D and STP work has been completed. STP is operational. ( Expenditure Including NMCG+ SPV release) | ||||||||||||||||||||||||
48 | प्रयागराज नगर के निर्मित STP के पुर्नरोद्धार तथा 15 वर्ष का O&M (HAM PPP) | 0 MLD | 1 No. | 2.6 KM | 0 No. | 0 | पूर्ण | 243.16 | 26.9% | नमामि गंगे | 904.0000 | 58.1500 | 0.0000 | 845.8500 | 09.03.18 | 16.09.2019 | मार्च-2020 | सितम्बर-2021 | पूर्ण | 243.16 | पूर्ण | 0.0 | ||
Remarks: Under O&M. ( Expenditure Including NMCG+ SPV release) | ||||||||||||||||||||||||
49 | इटावा नगर, में आई एण्ड डी. एवं एस.टी.पी. के कार्य | 0 MLD | 0 No. | 0 KM | 0 No. | 0 | पूर्ण | 51.79 | 36.83% | नमामि गंगे | 140.6000 | 56.8600 | 3.8900 | 79.8500 | 28.02.2019 | 22.7.2019 | अक्टूबर-2020 | April-2021 | पूर्ण | 51.79 | पूर्ण | 0.0 | ||
Remarks: Under Trial & Run | ||||||||||||||||||||||||
50 | कासगंज नगर, में आई एण्ड डी. एवं एस.टी.पी. के कार्य | 0 MLD | 0 No. | 0 KM | 0 No. | 0 | पूर्ण | 39.28 | 51.19% | नमामि गंगे | 76.73 | 36.6000 | 2.4900 | 37.6400 | 24.12.2018 | 5.7.2019 | दिसम्बर-2020 | जुलाई-2021 | पूर्ण | 39.28 | पूर्ण | 0.0 | ||
Remarks: Under Trial & Run | ||||||||||||||||||||||||
51 | चुनार नगर में फिकल स्लज मैनेजमेन्ट का कार्य | 0 MLD | 0 No. | 0 KM | 0 No. | 0 | पूर्ण | 1.98 | 73.33% | नमामि गंगे | 2.7000 | 2.1556 | 0.0690 | 0.4800 | 07.03.2019 | 9.11.2019 | मार्च-2020 | सितम्बर-2020 | पूर्ण | 1.98 | पूर्ण | 0.0 | ||
Remarks: Under O&M. | ||||||||||||||||||||||||
52 | फिरोजाबाद नगर, में आई एण्ड डी. के कार्य | 0 MLD | 0 No. | 0 KM | 0 No. | 0 | पूर्ण | 25.47 | 49.86% | नमामि गंगे | 51.0800 | 23.9200 | 1.6350 | 25.5300 | 01.03.2019 | 14.11.2019 | सितम्बर-2020 | June-2021 | पूर्ण | 25.47 | पूर्ण | 0.0 | ||
Remarks: कार्य पूर्ण |