Achievement in percentage |
|
Projects of Sewerage Infrastructure | |
Projects of Ghats | Completed |
Projects of Crematoria | Completed |
Planned | Achieved | Achievement in percentage |
|
---|---|---|---|
Sewerage Projects |
46 29 - DBOT 17 - HAM |
25 Completed 19 Ongoing 02 Tendering |
100% 43% .. |
Ghats Construction | 68 | 68 | Completed |
Crematoria Construction | 13 | 13 | Completed |
District | Actions |
---|---|
Varanasi | View Report |
Bithoor | View Report |
Moradabad | View Report |
Household Sewerage Connection | View Report |
Comparative Progress Jaunpur Project | View Report |
Kanpur | View Report |
Varanasi / Vindhyachal | View Report |
Varanasi / Jaunpur | View Report |
District | Actions |
---|---|
Baghpat | View Report |
Etawah | View Report |
Firozabad | View Report |
Kasganj | View Report |
Moradabad | View Report |
Prayagraj (Distt-A) | View Report |
Prayagraj (Distt-B) | View Report |
Ghaziabad | View Report |
Baghpat | View Report |
Kanpur | View Report |
Etawah | View Report |
Salori - Praagraj | View Report |
Sultanpur | View Report |
Anupshahar | View Report |
Kasganj | View Report |
Ramnagar | View Report |
Chunar | View Report |
Fiorozabad | View Report |
Prayagraj (District - C) | View Report |
Vrindavan | View Report |
# | Details | Actions |
---|---|---|
1 | मा0 मंत्री जी, जल शक्ति विभाग, उ0प्र0 की अध्यक्षता में दिनांक 05.04.2021 को सम्पन्न नमामि गंगे परियोजनाओं की समीक्षा बैठक की कार्यवृत्त पर अनुपालन के सम्बन्ध में। | View Report |
2 | Jaunpur Inspection Compliance | View Report |
3 | Sultanpur Inspection Compliance | View Report |
4 | Shuklaganj 5MLD STP Inspection Compliance | View Report |
5 | Jaunpur Inspection Compliance Report | View Report |
6 | Action Taken Report regarding Appearance of Alagal Bloom in River Ganga from Distt. Mizapur to U/s Varanasi. | View Report |
7 | I&D and 30MLD STP Inspection Compliance Report | View Report |
Report | Actions |
---|---|
Work Status | View Report |
Ghats / Crematorias Camera Status | View Report |
NG-5 | View Report |
NG-6 | View Report |
NG-7 | View Report |
NG-8 | View Report |
National Ganga Council | View Report |
NG-C (IEC) | View Report |
Gomti River Summary | View Report |
Rapti River Summary | View Report |
Report | Actions |
---|---|
April 2021 | View Report |
March 2021 | View Report |
February 2021 | View Report |
January 2021 | View Report |
Ganga River - May 2021 | View Report |
River wise | View Report |
परियोजनाओं की स्थिति | परियोजनाओं की संख्या | परियोजनाओं की लागत ( रु0 करोड़ में ) | टैप किये जाने वाले ड्रेनों की संख्या | निर्माणाधीन एस0टी0पी0 की क्षमता |
आयोजित परियोजनाएँ | 32 | 7745.76 Cr. | 159 | 805 MLD |
S.No. | Name of the Project | District | Zone | Total Estimated Cost (cr) | No. of drains to be tapped | Proposed STP Capacity (MLD) | Status |
---|---|---|---|---|---|---|---|
1 | I & D and STP works at Mughal Sarai town, Distt. Pt. Deen Dayal Nagar | Varanasi | Varanasi | 276.14 | 2 | 37 | DPR is submitted to NMCG. NMCG has appointed its TPI for its appraisal of DPR. |
2 | I&D of Assi Nala and additional construction of STP at Ramna, Varanasi | 200 | 1 | 40 | It has directed to assess the non-peak season flow for 3-5 days. | ||
3 | I&D and STP works at Lohta, Varanasi | 250 | 1 | 60 | it has directed to assess the non-peak season flow for 3-5 days. | ||
4 | I & D and STP works of drains falling in Ghaghara at Dohrighat, Distt. Mau | Mau | 50.19 | 4 | 2.5 | Private Land to be purchased. Drain discharge measurement is in progress. | |
5 | I & D of Rasulabad Ghat drains and augmentation of STPs at Prayagraj | Prayagraj | Prayagraj | 1193.92 | 7 | 93 | DPR submitted to SMCG vide letter dated 05.03.2022. |
6 | I&D of 13 drains and augmentation of Salori STP and Sadar Bazaar Drain at Prayagraj | 640.46 | 14 | 25 | DPR submitted to SMCG vide letter dated 18.02.2022. | ||
7 | 8 no. of drains belong to Sewerage District-A area, at Prayagraj | 750 | 8 | - | DPR to be submitted by 30.03.2022. | ||
8 | Sewage treatment of 6 drains in sewerage district G (Naini) & sewerage district F (Phaphamau) at Prayagraj | 81.48 | 6 | - | DPR has been prepared and will be submitted by 28.03.2022. | ||
9 | DPR for I&D of 7 drains of Kanpur City | Kanpur | 61.48 | 7 | - | DPR submitted to NMCG vide letter dated 20.12.2021 | |
10 | Renovation and imp. of Sewage System and Rehabilitation of old trunk in Sewerage District - 1, Distt. Kanpur | Kanpur | 432.69 | 0 | - | DPR to be submitted under State Sector as NMCG did not consider the DPR. | |
11 | Interception , Diversion and Treatment Works for Abatement of Pollution of River Ganga at Manikpur, Distt. Pratapgarh | Pratapgarh | 41.05 | 5 | Wetland Tech. based STP | DPR has been prepared and will be submitted by 28.03.2022. | |
12 | Balance drains tapping & augmentation of SPS at Agra city | Agra | Agra | 78.95 | 37 | - | DPR pending in NMCG since April, 2021. |
13 | I & D works for Kosi Kalan NP at Distt. Mathura | Mathura | 94.74 | 1 | 10 | DPR was submitted to SMCG vide letter dated 11.03.2022. | |
14 | I & D of Chaitanya Vihar (Kosi drain 1/3), at Distt. Mathura (Mathura –Vrindavan Nagar Nigam) | 76.28 | 1 | 10.5 | Land issue to be pursued with DM, Mathura. DPR to be prepared thereafter. | ||
15 | I & D works for zone - III (Koyla Alipur) at Distt. Mathura | 319.49 | 3 | 10 | |||
16 | I & D works for Chhata NP at Distt. Mathura | 97.56 | 2 | 6 | |||
17 | I & D and STP works of Aligarh Drain at Aligarh | Aligarh | 577.57 | 1 | 106 | Land issue at 2 locations, to be pursued with DM, Aligarh. | |
18 | I & D and STP works of Aligarh-Hathras Drain at Hathras | Hathras | 179.17 | 1 | 28 | Revised DPR, after incorporating observations submitted to SMCG vide letter | |
19 | DPR for Pollution Abatement of River Gomti at Lucknow, Phase-II | Lucknow | Lucknow | 557.74 | 9 | 102 | Discharge Measurement is on progress. DPR will be submitted by 30.04.2022. |
20 | DPR for Pollution Abatement of River Gomti at Lucknow, Phase-III Bharwara | 402.63 | 4 | 85 | |||
21 | I&D & STP works at Tanda, Distt. Ambedkar Nagar | Ambedkar Nagar | 229.69 | 8 | 15 | DPR submitted to SMCG vide letter dated 18.02.2022. | |
22 | I & D & STP works at Dalmau, Distt. Raebareilly | Raebareilly | 72.23 | 9 | 4 | DPR submitted to NMCG vide SMCG letter dated 25.02.2022. | |
23 | I&D & STP works for 8 drains falling in River Rapti at Distt. Gorakhpur | Gorakhpur | Gorakhpur | 271.84 | 8 | 44 | Land issue. Private land is to be purchased. DPR will be submitted by 15.04.2022 |
24 | I & D and STP works at Barhalganj NP, Distt. Gorakhpur | 76.22 | 4 | 6 | DPR has been prepared and will be submitted by 28.03.2022 | ||
25 | I&D & STP works for Deoband, Distt. Saharanpur | Saharanpur | Meerut | 132.77 | 4 | 17 | DPR submitted in NMCG. Land issue. Rate is to be fixed with ADM (F/R). |
26 | I&D & STP works for Gulaothi, Distt. Bulandshahar | Bulandshahar | 78.42 | 1 | 10 | DPR was submitted to SMCG vide letter dated 27.01.2022. | |
27 | I & D works of Hapur City Drain at Hapur | Hapur | 48.19 | 1 | - | DPR was submitted to SMCG vide letter dated 27.01.2022. | |
28 | I & D works for Banat Town Drain at Shamli | Shamli | 18.25 | 3 | 4 | Private land is to be purchased. DPR has been prepared. | |
29 | I & D works for Shamli Town Drain at Shamli | 134.46 | 1 | 35 | Category of land is to be changed. Pending in Revenue Deptt. APD, SMCG has been requested for neccesary action vide JMD (G) letter dated 19.01.2022. PS, Namami Gange has requested DM, Shamli for necessary action vide letter | ||
30 | I & D works for Thanabhawan Town Drain at Shamli | 36.13 | 3 | 8 | Land is not available at Nagar Panchayat. Private Land is to be purchased. In purcussion with District administration for availibity of land. | ||
31 | I & D works for Babri Village Drain at Shamli | 21.62 | 1 | 4 | Private Land is to be purchased. Land for construction of STP is not identified yet. | ||
32 | DPR for I & D and STP works at Moradabad | Moradabad | Moradabad | 264.4 | 2 | 43 | DPR is pending for approval at NMCG level. |
Total | 7745.76 | 159 | 805 |
Sr. No. | Rivers | Tapped Drains | Untapped Drains | Total Drains |
Total Discharge (MLD) |
||
---|---|---|---|---|---|---|---|
No. |
Discharge (MLD) |
No. |
Discharge (MLD) |
||||
A | B | C1 | C2 | D1 | D2 | E1 (C1+D1) | E2 (C2+D2) |
1 | Gomti | 17 | 62.02 | 36 | 568.08 | 53 | 630.1 |
2 | Hindon | 0 | 0 | 82 | 517.06 | 82 | 517.06 |
3 | Ishan | 0 | 0 | 1 | 0 | 1 | 0 |
4 | Jargo river | 0 | 0 | 8 | 2.089 | 8 | 2.089 |
5 | Kaali | 0 | 0 | 1 | 0 | 1 | 0 |
6 | Kali East | 3 | 16.35 | 23 | 491.09 | 26 | 507.44 |
7 | Kane | 0 | 0 | 1 | 0 | 1 | 0 |
8 | Pandu | 3 | 75.25 | 2 | 70 | 5 | 145.25 |
9 | Ram ganga | 0 | 0 | 25 | 155.48 | 25 | 155.48 |
10 | Rapti | 0 | 0 | 8 | 13.998 | 8 | 13.998 |
11 | Sai | 0 | 0 | 8 | 41.04 | 8 | 41.04 |
12 | Saryu | 0 | 0 | 11 | 14.593 | 11 | 14.593 |
13 | Varuna | 6 | 35.3 | 11 | 35.49 | 17 | 70.79 |
|
29 | 188.92 | 217 | 1908.92 | 246 | 2097.84 |
Sr. No.
|
District | River | Untapped Drains | Tapped Drains | Total Drains | Total Discharge (MLD) | ||
No. | Discharge (MLD) | No. | Discharge (MLD) | |||||
A | B | C | D1 | D2 | E1 | E2 | F1 (D1+E1) | F2 (D2+E2) |
1 | Agra | Yamuna | 5 | 17.19 | 29 | 268.84 | 34 | 286.03 |
2 | Aligarh | Yamuna | 3 | 65.33 | 0 | 0 | 3 | 65.33 |
3 | Ambedkarnagar | Ghaghara | 5 | 32.98 | 0 | 0 | 5 | 32.98 |
4 | Amethi | Gomti | 1 | 5 | 0 | 0 | 1 | 5 |
5 | Amroha | Ganga | 1 | 25 | 0 | 0 | 1 | 25 |
6 | Auraiya | Yamuna | 2 | 6.55 | 0 | 0 | 2 | 6.55 |
7 | Ayodhya | Saryu | 5 | 25.65 | 5 | 4.94 | 10 | 30.59 |
8 | Azamgarh | Tamsa | 6 | 22.46 | 0 | 0 | 6 | 22.46 |
9 | Baghpat | Yamuna | 4 | 8.6 | 0 | 0 | 4 | 8.6 |
10 | Ballia | Ganga | 1 | 17 | 0 | 0 | 1 | 17 |
11 | Balrampur | Rapti | 1 | 12 | 0 | 0 | 1 | 12 |
12 | Barabanki | Gomti | 1 | 14 | 0 | 0 | 1 | 14 |
13 | Bareilly | Ramganga | 3 | 27.38 | 0 | 0 | 3 | 27.38 |
14 | Bhadohi | Varuna | 3 | 10.99 | 0 | 0 | 3 | 10.99 |
15 | Bijnore | Ganga | 1 | 15 | 2 | 11.05 | 3 | 26.05 |
16 | Bulandshahar | Ganga | 3 | 59.99 | 2 | 2.57 | 5 | 62.56 |
17 | Chandauli | Ganga | 2 | 29.33 | 0 | 0 | 2 | 29.33 |
18 | Chitrakoot | Yamuna | 1 | 5 | 0 | 0 | 1 | 5 |
19 | Deoria | Ghaghara | 2 | 8.5 | 0 | 0 | 2 | 8.5 |
20 | Etawah | Yamuna | 0 | 0 | 2 | 30.99 | 2 | 30.99 |
21 | Farrukhabad | Ganga | 6 | 34.86 | 2 | 17.63 | 8 | 52.49 |
22 | Firozabad | Yamuna | 1 | 4.94 | 2 | 54.26 | 3 | 59.2 |
23 | Gautam Buddha Nagar | Yamuna | 2 | 1.54 | 0 | 0 | 2 | 1.54 |
24 | Gharmuktheshwar | Ganga | 0 | 0 | 1 | 4 | 1 | 4 |
25 | Ghaziabad | Hindon | 3 | 37.88 | 1 | 90 | 4 | 127.88 |
26 | Ghazipur | Ganga | 6 | 35.88 | 0 | 0 | 6 | 35.88 |
27 | Gorakhpur | Ramgarhtal | 7 | 87.38 | 6 | 118 | 13 | 205.38 |
28 | Hamirpur | Yamuna | 2 | 11.4 | 0 | 0 | 2 | 11.4 |
29 | Hapur | Ganga | 3 | 34.75 | 1 | 4 | 4 | 38.75 |
30 | Hardoi | Sai | 1 | 1.08 | 0 | 0 | 1 | 1.08 |
31 | Hathras | Yamuna | 1 | 26.6 | 0 | 0 | 1 | 26.6 |
32 | Jalaun (Kalpi) | Yamuna | 1 | 21 | 0 | 0 | 1 | 21 |
33 | Jaunpur | Gomti | 7 | 24.7 | 0 | 0 | 7 | 24.7 |
34 | Jhansi | Betwa | 1 | 3 | 0 | 0 | 1 | 3 |
35 | Kannauj | Kali | 0 | 0 | 3 | 16.35 | 3 | 16.35 |
36 | Kanpur | Ganga | 2 | 70 | 26 | 251.11 | 28 | 321.11 |
37 | Kasganj | Kali | 3 | 13.53 | 0 | 0 | 3 | 13.53 |
38 | Lucknow | Gomti | 3 | 90.73 | 25 | 518.64 | 28 | 609.37 |
39 | Mathura | Yamuna | 5 | 15.88 | 33 | 61.54 | 38 | 77.42 |
40 | Meerut | Kali | 3 | 32.99 | 1 | 161.7 | 4 | 194.69 |
41 | Mirzapur | Ganga | 3 | 61.85 | 10 | 14.2 | 13 | 76.05 |
42 | Moradabad | Ramganga | 5 | 60.54 | 13 | 38.15 | 18 | 98.69 |
43 | Muzaffarnagar | Kali | 5 | 79 | 3 | 25.06 | 8 | 104.06 |
44 | Pratapgarh | Ganga | 10 | 12.73 | 0 | 0 | 10 | 12.73 |
45 | Prayagraj | Ganga | 12 | 87.3 | 16 | 102.8 | 28 | 190.1 |
Prayagraj | Prayagraj | Yamuna | 7 | 21.87 | 8 | 75.12 | 15 | 96.99 |
46 | Raebareilly | Ganga | 13 | 25.66 | 0 | 0 | 13 | 25.66 |
47 | Rampur | Ramganga | 1 | 34.31 | 0 | 0 | 1 | 34.31 |
48 | Saharanpur | Hindon | 10 | 53.92 | 13 | 63.17 | 23 | 117.09 |
49 | Sant Kabirnagar | Aami | 3 | 11 | 0 | 0 | 3 | 11 |
50 | Shamli | Krishni | 8 | 28.5 | 0 | 0 | 8 | 28.5 |
51 | Sitapur | Gomti | 3 | 25 | 0 | 0 | 3 | 25 |
52 | Sultanpur | Gomti | 3 | 5.7 | 3 | 8.54 | 6 | 14.24 |
53 | Unnao | Ganga | 8 | 23.08 | 0 | 0 | 8 | 23.08 |
54 | Varanasi | Ganga | 12 | 23.99 | 30 | 341.21 | 42 | 365.2 |
Grand Total | 134 | 772.73 | 167 | 897.44 | 301 | 1670.17 |
Sr. No. | Name of Town/District | Name of STP | Project Name | Design Technology | Capacity of STP (MLD) | Design Parameter | Inlet Parameter | Outlet Parameter | Influent (MLD) | %age Utilization | Agency Maintaining the STP | Functional / Non-Functional | Compliant / Non-Compliant | Updation Date | |||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
BOD | TSS | BOD | COD | TSS | BOD | COD | TSS | ||||||||||||
1 | Prayagraj | Kodra | 1. Sewerage & Non-Sewerage schemes for Pollution abatement of River Ganga at District-'B' & 'E' of AllahabadSewerage & Non-Sewerage schemes for Pollution abatement of River Ganga at District-'B' & 'E' of Allahabad - 85 MLD | HRBF | 25.00 | <20 | <30 | 143 | 320 | 281 | 14 | 36 | 21 | 27.55 | 110% | M/s Prayagraj Water Pvt. Ltd. (Adani) | Functional | Compliant | 07-05-2022 |
2 | Prayagraj | Numayadih | 1. Sewerage & Non-Sewerage schemes for Pollution abatement of River Ganga at District-'B' & 'E' of AllahabadSewerage & Non-Sewerage schemes for Pollution abatement of River Ganga at District-'B' & 'E' of Allahabad - 85 MLD | HRBF | 50.00 | <20 | <30 | 140 | 280 | 205 | 17 | 40 | 26 | 64.51 | 129% | M/s Prayagraj Water Pvt. Ltd. (Adani) | Functional | Compliant | 30-04-2022 |
3 | Prayagraj | Ponghat | 1. Sewerage & Non-Sewerage schemes for Pollution abatement of River Ganga at District-'B' & 'E' of AllahabadSewerage & Non-Sewerage schemes for Pollution abatement of River Ganga at District-'B' & 'E' of Allahabad - 85 MLD | HRBF | 10.00 | <20 | <30 | 142 | 320 | 254 | 15 | 40 | 22 | 12.10 | 121% | Prayagraj Water Pvt. Ltd. (Adani) | Functional | Compliant | 14-03-2022 |
4 | Prayagraj | Naini - 2 | 2. Sewerage & Non-Sewerage schemes for Pollution abatement of River Ganga at District-'A' of Allahabad | ASP | 20.00 | <30 | <50 | 129 | 340 | 298 | 21 | 44 | 33 | 30.00 | 150% | M/s Prayagraj Water Pvt. Ltd. (Adani) | Functional | Compliant | 26-04-2022 |
5 | Prayagraj | Salori - 2 | 3. 14 mld STP at Salori, Allahabad | SBR | 14.00 | <10 | <10 | 135 | 312 | 262 | 16 | 32 | 26 | 60.92 | 435% | M/S Toshiba water solutions prayagraj | Functional | Non-Compliant | 10-02-2022 |
6 | Varanasi | Varanasi GAP-II (JICA) | 4. JICA assisted Ganga Action Plan Phase-II Project at Varanasi (EAP - JICA) Construction of 140 MLD STP at Dinapur | ASP | 140.00 | 20 | 30 | 80 | 202 | 176 | 11 | 24 | 18 | 133.35 | 95% | VA-Tech Wabag | Functional | Compliant | 30-04-2022 |
7 | Garhmukteshwar | Garhmukteshwar-I (NGRBA) | 5. Sewerage system & STP works - 9 MLD | UASB | 6.00 | < 20 | <30 | 175 | 230 | 220 | 15 | 55 | 22 | 3.50 | 58% | M/S Anandilal lalpuria | Functional | Compliant | 04-07-2021 |
8 | Garhmukteshwar | Garhmukteshwar-II (NGRBA) | 5. Sewerage system & STP works - 9 MLD | UASB | 3.00 | < 20 | <30 | 180 | 210 | 195 | 12 | 67 | 18 | .55 | 18% | M/S Anandilal lalpuria | Functional | Compliant | 04-07-2021 |
9 | Moradabad | Moradabad (NGRBA) | 6. Sewerage system & STP works (Phase I ) | UASB | 58.00 | < 10 | < 10 | 165 | 291.2 | 210 | 8.4 | 38.2 | 9.0 | 23.112 | 40% | L&T | Functional | Compliant | 04-05-2022 |
10 | Kannauj | Kannauj (State/ NGRBA) | 7. Sewerage system & STP works (Phase II) | SBR | 13.00 | <10 | <10 | 59 | 268 | 243 | 5 | 42 | 8 | 7.0 | 54% | UPJN | Functional | Compliant | 07-05-2022 |
11 | Narora | Narora (NGRBA) | 8. Sewerage scheme at Narora, Bulandshar | UASB | 4.00 | < 10 | <30 | 281 | 198 | 334 | 22.9 | 9.2 | 13 | 3.60 | 90% | M/S EMS Infracon | Functional | Non-Compliant | 11-05-2022 |
12 | Anupshahar | Anupshahar (NGRBA) Zone A | 9. Sewerage Works in Anup Shahar, Buland Shahar - 2.5 MLD | UASB | 1.50 | < 10 | < 10 | 168 | 282 | 340 | 9 | 24.8 | 9 | 2.13 | 142% | LC Infra Projects P Ltd. | Functional | Compliant | 11-05-2022 |
13 | Anupshahar | Anupshahar | 9. Sewerage Works in Anup Shahar, Buland Shahar - 2.5 MLD | MBBR | 1.00 | < 10 | < 10 | 181 | 388 | 321 | 8 | 36 | 7 | 34.53 | 3453% | Functional | Compliant | 29-04-2022 | |
14 | Bithoor | Bithoor STP | 10. Sewerage scheme and STP at Bithoor Kanpurnagar, (UP) | - | 2.40* | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | NGRBA | Functional | Non-Compliant | 29-04-2022 | ||
|
347.9 | 437.382 | 126% |
|
||||||||
---|---|---|---|---|---|---|---|---|
River Name | Total No. of Drains | Tapped | Partially Tapped | Untapped | ||||
Nos. | Discharge (MLD) | No. | Discharge (MLD) | No. | Discharge (MLD) | No. | Discharge (MLD) | |
Ganga | 112 | 811.82 | 71 | 332.11 | 1 | 19.83 | 40 | 459.88 |
Yamuna | 189 | 858.35 | 67 | 263.147 | 5 | 188.729 | 117 | 366.472 |
Total | 301 | 1670.17 | 138 | 595.58 | 6 | 301.86 | 134 | 772.73 |
|
||||
---|---|---|---|---|
Sl. No. | Description | Phase - I, Segment B | Phase - II, Segment B | Total |
1 | Drains to be tapped in projects Under Construction (Click to View Details) |
24 | 18 | 42 |
2 | Drains to be tapped in sanctioned projects (Under Tendering) (Click to View Details) |
10 | 35 | 45 |
3 | Drains to be tapped in projects submitted for approval (Click to View Details) |
09 | 38 | 47 |
Total | 43 | 91 | 134 |
|
|||||||
---|---|---|---|---|---|---|---|
Total No. of Drains | Tapped | Partially Tapped | Untapped | ||||
Nos. | Discharge (MLD) | No. | Discharge (MLD) | No. | Discharge (MLD) | No. | Discharge (MLD) |
301 | 807.25 | 138 | 387.3 | 23 | 171.44 | 140 | 248.51 |
|
|||||
---|---|---|---|---|---|
Sr. No. | FY | Santioned Projects | Completed Projects | ||
Nos. | STP Capacity (MLD) | Nos. | STP Capacity (MLD) | ||
1 | 2010-11 | 7 | 325 | 0 | 0 |
2 | 2011-12 | 0 | 0 | 0 | 0 |
3 | 2012-13 | 0 | 0 | 0 | 0 |
4 | 2013-14 | 4 | 18 | 0 | 0 |
5 | 2014-15 | 2 | 2.5 | 0 | 0 |
6 | 2015-16 | 0 | 0 | 2 | 105 |
7 | 2016-17 | 4 | 0 | 2 | 14 |
8 | 2017-18 | 11 | 265.4 | 2 | 17 |
9 | 2018-19 | 15 | 700.11 | 7 | 209.5 |
10 | 2019-20 | 1 | 17 | 3 | 2.4 |
11 | 2020-21 | 1 | 15 | 8 | 60.01 |
12 | 2021-22 | 1 | 33 | 0 | 0 |
Grand Total | 46 | 1376.01 | 24 | 407.91 |
Sr. No. | District | River | Untapped Drains | Tapped Drains | Total Drains | Total Discharge | ||
---|---|---|---|---|---|---|---|---|
No. | Discharge | No. | Discharge | (MLD) | ||||
(MLD) | (MLD) | |||||||
1 | Agra | Yamuna | 61 | 17.172 | 29 | 268.842 | 90 | 286.014 |
2 | Aligarh | Yamuna | 6 | 8.51 | 0 | 0 | 6 | 8.51 |
3 | Allahabad | Ganga ,Yamuna | 31 | 117.43 | 43 | 189.86 | 74 | 307.29 |
4 | Ayodhya | Saryu | 15 | 24.52 | 4 | 4.94 | 19 | 29.46 |
5 | Baghpat | Yamuna | 4 | 8.6 | 0 | 0 | 4 | 8.6 |
6 | Ballia | Ganga | 1 | 19.6 | 0 | 0 | 1 | 19.6 |
7 | Balrampur | Rapti | 1 | 12 | 0 | 0 | 1 | 12 |
8 | Banda | Kane | 1 | 0 | 0 | 0 | 1 | 0 |
9 | Bareilly | Ram ganga | 3 | 27.38 | 0 | 0 | 3 | 27.38 |
10 | Bhadohi | Varuna | 3 | 10.99 | 0 | 0 | 3 | 10.99 |
11 | Bijnore | Ganga ,Ram ganga | 1 | 15 | 2 | 11.05 | 3 | 26.05 |
12 | Budhana | Kali East | 3 | 10.07 | 0 | 0 | 3 | 10.07 |
13 | Bulandsahar | Ganga ,Kali East | 13 | 30.77 | 1 | 0.81 | 14 | 31.58 |
14 | Chanduali | Ganga | 2 | 12 | 0 | 0 | 2 | 12 |
15 | Chitrakoot | Yamuna | 1 | 5 | 0 | 0 | 1 | 5 |
16 | Chunar | Jargo river | 8 | 2.089 | 0 | 0 | 8 | 2.089 |
17 | Etawah | Yamuna | 0 | 0 | 2 | 30.99 | 2 | 30.99 |
18 | Farrukhabad | Ganga | 6 | 34.86 | 2 | 17.63 | 8 | 52.49 |
19 | Firozabad | Yamuna | 1 | 4.94 | 2 | 32.94 | 3 | 37.88 |
20 | Ghaziabad | Hindon,Kali East | 12 | 349.9 | 1 | 90 | 13 | 439.9 |
21 | Ghazipur | Ganga | 34 | 35.858 | 0 | 0 | 34 | 35.858 |
22 | Gorakhpur | Rapti, Rohini | 22 | 78.97 | 0 | 0 | 22 | 78.97 |
23 | Greater Noida | Yamuna | 1 | 0 | 0 | 0 | 1 | 0 |
24 | Hamirpur | Yamuna | 1 | 10 | 0 | 0 | 1 | 10 |
25 | Hapur | Ganga ,Kali East | 3 | 34.75 | 1 | 4 | 4 | 38.75 |
26 | Hardoi | Sai | 1 | 6.5 | 0 | 0 | 1 | 6.5 |
27 | Hathras | Karvan | 1 | 26.6 | ||||
28 | Jallaun | Yamuna | 1 | 21 | 0 | 0 | 1 | 21 |
29 | Jaunpur | Gomti | 14 | 24.72 | 0 | 0 | 14 | 24.72 |
30 | Kannauj | Kali East | 0 | 0 | 3 | 16.35 | 3 | 16.35 |
31 | Kanpur | Ganga ,Pandu | 7 | 73.44 | 20 | 250.57 | 27 | 324.01 |
32 | Kasganj | Yamuna | 3 | 13.53 | 0 | 0 | 3 | 13.53 |
33 | Lucknow | Gomti | 17 | 497.1 | 16 | 94.04 | 33 | 591.14 |
34 | Mainpuri | Ishan | 1 | 0 | 0 | 0 | 1 | 0 |
35 | Mathura | Yamuna | 9 | 15.88 | 33 | 61.54 | 42 | 77.42 |
36 | Meerut | Kali East | 3 | 378 | 0 | 0 | 3 | 378 |
37 | Mirzapur | Ganga | 17 | 61.935 | 10 | 14.2 | 27 | 76.135 |
38 | Moradabad | Ram ganga | 6 | 49.38 | 14 | 39.85 | 20 | 89.23 |
39 | Muzaffar nagar | Kaali,Hindon | 9 | 61.84 | 2 | 21.9 | 11 | 83.74 |
40 | Noida | Yamuna | 1 | 0 | 0 | 0 | 1 | 0 |
41 | Pratapgarh | Ganga ,Sai | 11 | 16.027 | 0 | 0 | 11 | 16.027 |
42 | Raebareilly | Ganga ,Sai | 13 | 25.659 | 0 | 0 | 13 | 25.659 |
43 | Rampur | Ram ganga | 1 | 34.31 | 0 | 0 | 1 | 34.31 |
44 | Saharanpur | Hindon | 68 | 89.69 | 5 | 3.97 | 73 | 93.66 |
45 | Shamli | Krishna | 8 | 28.6 | 0 | 0 | 8 | 28.6 |
46 | Sultanpur | Gomti | 3 | 5.7 | 3 | 8.54 | 6 | 14.24 |
47 | Tanda | Saryu | 7 | 9.653 | 0 | 0 | 7 | 9.653 |
48 | Unnao | Ganga | 6 | 23.08 | 0 | 0 | 6 | 23.08 |
49 | Varanasi | Ganga ,Varuna | 9 | 28.49 | 35 | 289.2 | 44 | 317.69 |
Grand Total | 1826.01 | 2385.543 | 635.91 | 1451.222 | 677 | 3786.165 |
Chart Legends: ![]() |
क्र.सं- | योजना का नाम | STP Capacity (MLD) | No. of SPS | Sewer Line (KM) | No. of I&D Works | No. of NHAI Issues Reported | Overall Progress | वित्त पोषण | AA&ES and date | Date of start as per agreement | Expected date of completion | Previous Progress | Weekly Progress | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Physical Progress | Financial Progress | Physical Progress | Financial Progress | Physical Progress | Financial Progress | |||||||||||||||||||
Upto 29.01.2022 |
(रु0 करोड़ मेें) Upto 29.01.2022 |
(in Percentage as per Sanction Cost) Upto 29.01.2022 |
Sanction cost | Work Cost | Centage | O& M Cost ( 5/10/15 Years) | Sanction date | As per AAES | As per Agreement | Extended date | Upto 22.01.2022 (Total) | Upto 22.01.2022 (Total) |
22.01.2022 29.01.2022 (Total) |
22.01.2022 29.01.2022 (Total) |
||||||||||
प्रगति में चल रही योजनाएं | ||||||||||||||||||||||||
|
1 | जायका सहायतित सीवरेज योजना, वाराणसी | 140 MLD | 3 No. | 0 KM | 0 No. | 0 | 98.50% | 571.28 | 86.61% | जायका | 659.6200 | 633.4100 | 26.2100 | 0.0000 | 14.07.10/ 23.07.2020 | 10.1.2013 | जुलाई-2015 | मई-2017 | 98.50% | 571.28 | 0.0% | 0.00 | |
Remarks: कार्य प्रगति पर योजना में नाॅन सीवरेज कम्पोनेन्ट को व्यय सम्मिलित करते हुए। Desilting work of 998 m completed . Lining 353 m completed . (Weekly progress desilting -21 m) | ||||||||||||||||||||||||
|
2 | मथुरा नगर में I&D एवं STP के कार्य का पुनरोद्धार एवं क्षमता उच्चीकरण (HAM PPP) | 30 MLD | 8 No. | 0 KM | 20 No. | 0 | 99.90% | 276.29 | 60% | नमामि गंगे | 460.4500 | 264.4000 | 8.7800 | 187.2700 | 11.06.18 | 15.1.2019 | जून-2020 | जनवरी-2021 | 99.85% | 276.29 | 0.05% | 0.0 | |
Remarks: 8th milestone work has been completed and STP are operational, finishing work is under progress. ( Expenditure Including NMCG+ SPV release) | ||||||||||||||||||||||||
|
3 | शुक्लागंज, उन्नाव में आई.एण्ड डी. एवं एस.टी.पी. के कार्य ( HAM पी.पी.पी. आधारित) | 5 MLD | 0 No. | 0 KM | 0 No. | 0 | 38.00% | 8.42 | 12.92% | नमामि गंगे | 65.1800 | 25.9300 | 1.9000 | 37.3500 | 28.07.17 | 11.10.2019 | फरवरी-2020 | अक्टूबर-2021 | 38.00% | 8.42 | 0.00% | 0.0 | |
Remarks: कार्य प्रगति पर। ( Expenditure Including NMCG+ SPV release) | ||||||||||||||||||||||||
|
4 | उन्नाव नगर में आई.एण्ड डी. एवं एस.टी.पी. के कार्य ( HAM पी.पी.पी. आधारित) | 15 MLD | 0 No. | 3.2 KM | 1 No. | 0 | 76.22% | 30.46 | 29.8% | नमामि गंगे | 102.2000 | 43.7300 | 3.2200 | 55.2500 | 28.07.17 | 11.10.2019 | अपै्रल-2020 | अक्टूबर-2021 | 76.15% | 30.46 | 0.07% | 0.0 | |
Remarks: कार्य प्रगति पर। ( Expenditure Including NMCG+ SPV release) | ||||||||||||||||||||||||
|
5 | कानपुर नगर निर्मित STP के पुनरोद्धार,पनखा में I&D STP निर्माण,15Yr O&M(HAMPPP) | 30 MLD | 3 No. | 0 KM | 0 No. | 0 | 88.00% | 157.54 | 16.29% | नमामि गंगे | 967.2300 | 248.3900 | 0.0000 | 718.8400 | 12.03.18 | 11.10.2019 | मार्च-2020 | अक्टूबर-2021 | 87.50% | 157.54 | 0.50% | 0.0 | |
Remarks: M/S Shapoorji Pallonji and Company Pvt. Ltd. Mumbai (KRMPL) के साथ अनुबन्ध गठित। पनका एस0टी0पी0 का निर्माण कार्य प्रगति पर। ( Expenditure Including NMCG+ SPV release) | ||||||||||||||||||||||||
|
6 | नैनी, फाफामऊ,झूसी क्षेत्र प्रयागराज में I&D एवं STP के कार्य ( HAM PPP) | 42 MLD | 7 No. | 16.41 KM | 0 No. | 0 | 78.36% | 152.31 | 19.84% | नमामि गंगे | 767.6000 | 280.1400 | 21.6700 | 465.7900 | 19.05.17 | 16.09.2019 | मई-2020 | सितम्बर-2021 | 78.23% | 152.31 | 0.13% | 0.0 | |
Remarks: कार्य प्रगति पर। ( Expenditure Including NMCG+ SPV release) | ||||||||||||||||||||||||
|
7 | सुल्तानपुर नगर, में आई एण्ड डी. एवं एस.टी.पी. के कार्य | 10 MLD | 2 No. | 1 KM | 6 No. | 0 | 88.00% | 27.64 | 39.38% | नमामि गंगे | 70.1800 | 43.6778 | 2.5922 | 23.9100 | 04.12.2019 | 30.11.2019 | दिसम्बर-2020 | नवम्बर-2021 | 87.00% | 27.64 | 1.0% | 0.0 | |
Remarks: 10 mld STP ( Civil Work)- 94 % & ( E&M Work) -69% work has been completed. 5 mld STP ( Civil Work)-94 % work have been completed. 5 mld STP ( E&M Work)-66% work have been completed. 2 mld STP ( Civil Work)-52% work have been completed. 2 mld STP ( E&M Work)-58% work have been completed. Rising main - 1848.0 m out of 1920.0 m completed. Disposal line - 1093.0 m out of 1283.0 m completed. Staff quarter -40% completed. | ||||||||||||||||||||||||
|
8 | जौनपुर नगर, में आई एण्ड डी. एवं एस.टी.पी. के कार्य | 30 MLD | 0 No. | 7 KM | 0 No. | 0 | 97.00% | 105.10 | 51.01% | नमामि गंगे | 206.0500 | 132.8900 | 9.2536 | 63.9100 | 12.02.2019 | 21.10.2019 | फरवरी-2021 | अक्टूबर-2021 | 97.0% | 105.10 | 0.0% | 0.0 | |
Remarks: कार्य प्रगति में। | ||||||||||||||||||||||||
|
9 | बागपत नगर, में आई एण्ड डी. एवं एस.टी.पी. के कार्य | 14 MLD | 0 No. | 2425 KM | 4 No. | 0 | 90.50% | 20.92 | 27.04% | नमामि गंगे | 77.3600 | 38.7200 | 2.6616 | 35.9800 | 19.02.2019 | 8.01.2020 | फरवरी-21 | अप्रैल -2021 | 90.00% | 20.92 | 0.50% | 0.0 | |
Remarks: Main component completed and trail & Run of STP has been Started. | ||||||||||||||||||||||||
|
10 | मुज्जफर नगर, के सीवरेज योजनाओं के पुनरोद्धार का कार्य ( HAM पी.पी.पी. आधारित) | 54 MLD | 2 No. | 1.56 KM | 0 No. | 0 | 38.04 % | 28.365 | 12.12% | नमामि गंगे | 234.0300 | 108.3200 | 7.3300 | 118.3800 | 02.01.2019 | 04.10.2020 | जनवरी-2021 | 37.73% | 28.365 | 0.31 % | 0.0 | ||
Remarks: दिनांक 13-02.2020 को M/s GA Infra Pvt.Ltd,Jaipur JV M/s Buildcon Ltd,jaipur को एल.ओ.ए. जारी । At East zone,SBR wall and walkway casting work completed and finishing work in progress. At west zone, Pile work of SBR completed and Casting of Raft and Wall in progress.Construction of wall of CCT & IPS-4 is in progress. | ||||||||||||||||||||||||
|
11 | बुड़ाना नगर, में आई एण्ड डी. एवं एस.टी.पी. के कार्य ( HAM पी.पी.पी. आधारित) | 10 MLD | 0 No. | 0 KM | 0 No. | 0 | 49.35% | 10.46 | 21.45% | नमामि गंगे | 48.7600 | 25.1000 | 1.7000 | 21.9600 | 18.02.2019 | 04.10.2020 | फरवरी-2021 | 49.15% | 10.46 | 0.20% | 0.0 | ||
Remarks: दिनांक 13-02.2020 को M/sGA Infra Pvt.Ltd,Jaipur JV M/s Buildcon Ltd,jaipur को एल.ओ.ए. जारी । । SBR wall casting work completed and Walkway Casting in progress.work in progress. | ||||||||||||||||||||||||
|
12 | मुरादाबाद नगर, में आई एण्ड डी. एवं एस.टी.पी. के कार्य ( HAM पी.पी.पी. आधारित) | 25 MLD | 0 No. | 0 KM | 0 No. | 0 | 0.00% | 0.000 | 0% | नमामि गंगे | 118.6900 | 53.5300 | 3.5200 | 61.6400 | 23.07.18 | 29.02.2020 | जुलाई-2020 | 0.00% | 0.000 | 0.00% | 0.00 | ||
Remarks: दिनांक 29-02.2020 को M/s GA Infra Pvt.Ltd,Jaipur JV M/s Buildcon Ltd,jaipur को एल.ओ.ए. जारी । Matter sub-judice in Hon'ble HIgh Court, Allahabad.Alternate land has been identified for Construction of STP by District Administration vide letter dated 18.04.2022 | ||||||||||||||||||||||||
|
13 | लखनऊ नगर, में आई एण्ड डी. एवं एस.टी.पी. के कार्य | 82 MLD | 0 No. | 0 KM | 0 No. | 0 | 0.00% | 0.000 | 0% | नमामि गंगे | 213.9100 | 101.3100 | 6.9700 | 105.6300 | 02.03.2019/06.05.2020 | 17.09.2020 | मार्च-2021 | 0% | 0.000 | 0% | 0.00 | ||
Remarks: दिनांक 17.09.2020 को M/s RK Engineers Sales Ltd. Lucknow JV M/s Khilari Infrastructure Pvt.Ltd. Navi Mumbai को एल.ओ.ए. जारी। Matter sub-judice in Hon'ble Supreme Court, New Delhi. Next date of hearing is scheduled on 18.05.2022 | ||||||||||||||||||||||||
|
14 | फर्रूखाबाद-फतेहगढ़ में आई.एण्ड डी. एवं एस.टी.पी. के कार्य ( HAM पी.पी.पी. आधारित) | 35 MLD | 0 No. | 0 KM | 0 No. | 0 | 0.00% | 0.000 | 0% | नमामि गंगे | 261.12 | 181.73 | 6.9800 | 72.41 | 16.10.17/12.01.2021 | 24.12.2020 | अक्टूबर -2019 | 0% | 0.000 | 0% | 0.00 | ||
Remarks: LOA has been issued to M/s HNB Engineers Pvt Ltd, Mahahrastra on 29.10.2021. | ||||||||||||||||||||||||
|
15 | गाजीपुर में आई.एण्ड डी. एवं एस.टी.पी. के कार्य ( HAM पी.पी.पी. आधारित) | 0 MLD | 0 No. | 0 KM | 0 No. | 0 | 0.00% | 0.000 | 0% | नमामि गंगे | 152.8300 | 53.5973 | 3.0627 | 96.1700 | 16.11.2017 / 06.05.2020 | 20.02.2021 | दिसम्बर-2019 | 0% | 0.000 | 0% | 0.00 | ||
Remarks: Effective date of start has been given as 10.04.2022 by NMCG. Excavation & PCC of retaining wall completed. RCC work of retaining wall is in progress. | ||||||||||||||||||||||||
|
16 | मिर्जापुर में आई.एण्ड डी. एवं एस.टी.पी. के कार्य ( HAM पी.पी.पी. आधारित) | 18 MLD | 0 No. | 0 KM | 0 No. | 0 | 0.00% | 0.020 | 0.02% | नमामि गंगे | 129.0800 | 51.9825 | 4.0400 | 73.0500 | 14.11.2017/ 28.05.2020 | 20.02.2021 | फरवरी-2020 | 0% | 0.020 | 0% | 0.00 | ||
Remarks: Effective date of start has been given as 10.04.2022 by NMCG . Excavation and PCC work of Pakka Pokhara SBR basin has been completed. RCC work of Raft Foundation is in Progress. | ||||||||||||||||||||||||
|
17 | बरेली नगर, में आई एण्ड डी. एवं एस.टी.पी. के कार्य ( HAM पी.पी.पी. आधारित) | 63 MLD | 0 No. | 0 KM | 0 No. | 0 | 0.10% | 0.000 | 0% | नमामि गंगे | 271.3900 | 139.4400 | 10.7000 | 121.2500 | 03.01.2019 | जनवरी-2021 | 0.10% | 0.000 | 0.00% | 0.00 | |||
Remarks: दिनांक 28.07.2021 को M/s Enviro Infra Engineers Pvt. Ltd, Delhi को एल.ओ.ए. जारी । Costruction of boundary wall started at 20 MLD STP. | ||||||||||||||||||||||||
|
18 | कैराना नगर, में आई एण्ड डी. एवं एस.टी.पी. के कार्य | 15 MLD | 0 No. | 0 KM | 0 No. | 0 | 28.00 % | 8.30 | 10.58% | नमामि गंगे | 78.42 | 35.9700 | 3.9400 | 38.5100 | 07.12.2020 | दिसम्बर-2022 | 26.20 % | 8.30 | 1.80% | 0.0 | |||
Remarks: दिनांक 24.08.2021 को M/s SIPL JV RKC, Gurugram, Harayana को एल.ओ.ए. जारी । कार्य प्रगति में। | ||||||||||||||||||||||||
|
19 | फैजाबाद नगर, जनपद अयोध्या में आई.एण्ड.डी एवं एस.टी.पी. के कार्य (HAM आधारित) | 0 MLD | 0 No. | 5 KM | 0 No. | 0 | 0.00% | 0.000 | 0% | नमामि गंगे | 221.66 | 116.65 | 3.9400 | 105.01 | 06.05.2021 | अप्रैल-2023 | 0% | 0.000 | 0% | 0.00 | |||
Remarks: LOA issued to M/s ECO Protection Engineers Private Limited,Annanagar,Chennai on 30.12.2021 | ||||||||||||||||||||||||
टेन्डर प्रकिया में चल रही योजनाएं | ||||||||||||||||||||||||
20 | आगरा नगर, के सीवरेज योजनाओं के पुनरोद्धार एवं 15 वर्षों का रखरखाव के कार्य ( HAM पी.पी.पी. आधारित) | 0 MLD | 0 No. | 0 KM | 0 No. | 0 | 0.00% | 0.000 | 0% | नमामि गंगे | 842.2500 | 371.29 | 25.40 | 445.56 | 24.12.2018/ 06.05.2020 | अनुबन्ध के दिनांक से 02 वर्ष तक पूर्ण करना है। | 0% | 0.000 | 0% | 0.00 | ||||
Remarks: Tender is invited on 22.09.2021. 10 bid received . Technical evaluation completed and evaluation report sent to NMCG,New Delhi. Financial bid opened on 19.02.2022 and evaluation completed. NOC has been received from NMCG by email on 05.05.2022. | ||||||||||||||||||||||||
21 | मेरठ नगर, में आई एण्ड डी. एवं एस.टी.पी. के कार्य (HAM पी.पी.पी. आधारित) | 0 MLD | 0 No. | 0 KM | 0 No. | 0 | 0.00% | 0.000 | 0% | नमामि गंगे | 690.7100 | 384.2100 | 26.3100 | 280.1900 | 19.02.2019/06.05.2020 | फरवरी-2021 | 0% | 0.000 | 0% | 0.00 | ||||
Remarks: Tender is invited on 08.03.2022. 19 bid received. Technical evaluation is under progress. | ||||||||||||||||||||||||
पूर्ण योजनाएं | ||||||||||||||||||||||||
22 | सीवरेज एण्ड नाॅन सीवरेज योजना, प्रयागराज, डिस्ट्रिक्ट-बी, ई | 0 MLD | 0 No. | 0 KM | 0 No. | 0 | पूर्ण | 174.63 | 84.2% | नाॅन ई.ए.पी. | 207.39 | 187.53 | 19.8600 | 0.0000 | 06.05.10 | 27.4.2015 | फरवरी-2013 | मार्च-2016 | पूर्ण | 174.63 | पूर्ण | 0.00 | ||
Remarks: कार्य पूर्ण | ||||||||||||||||||||||||
23 | सीवरेज एण्ड नाॅन सीवरेज योजना, प्रयागराज, डिस्ट्रिक्ट-ए | 0 MLD | 0 No. | 0 KM | 0 No. | 0 | पूर्ण | 89.850 | 91.73% | ई.ए.पी. | 97.95 | 97.95 | 0.0000 | 0.0000 | 06.05.10 | 8.12.2010 | फरवरी-2013 | मार्च-2016 | पूर्ण | 89.850 | पूर्ण | 0.00 | ||
Remarks: कार्य पूर्ण | ||||||||||||||||||||||||
24 | सीवरेज योजना, डिस्ट्रिक्ट-ई, प्रयागराज | 0 MLD | 0 No. | 0 KM | 0 No. | 0 | पूर्ण | 137.22 | 96.63% | ई.ए.पी. | 142.0000 | 126.7000 | 6.5700 | 8.7300 | 22.02.11 | 6.11.2011 | फरवरी-2013 | जून-2016 | पूर्ण | 137.22 | पूर्ण | 0.00 | ||
Remarks: कार्य पूर्ण | ||||||||||||||||||||||||
25 | 14 एम.एल.डी. एस.टी.पी. सलोरी, प्रयागराज | 0 MLD | 0 No. | 0 KM | 0 No. | 0 | पूर्ण | 33.270 | 78.47% | ई.ए.पी. | 42.4000 | 23.7706 | 1.9016 | 16.7246 | 27.11.13 | 6.12.2011 | फरवरी-2016 | सितम्बर-2016 | पूर्ण | 33.270 | पूर्ण | 0.00 | ||
Remarks: कार्य पूर्ण | ||||||||||||||||||||||||
26 | सीवरेज नेटवर्क डिस्ट्रिक्ट-ई, प्रयागराज (अति. कार्य) | 0 MLD | 0 No. | 0 KM | 0 No. | 0 | पूर्ण | 50.310 | 95.32% | ई.ए.पी. | 52.7800 | 48.9000 | 3.8800 | 0.0000 | 28.09.16 | 10.4.2017 | सितम्बर-2016 | अप्रैल-2018 | पूर्ण | 50.310 | पूर्ण | 0.00 | ||
Remarks: कार्य पूर्ण | ||||||||||||||||||||||||
27 | सीवरेज परियोजना, कन्नौज | 0 MLD | 0 No. | 0 KM | 0 No. | 0 | पूर्ण | 37.050 | 84.86% | नाॅन ई.ए.पी. | 43.6600 | 38.3700 | 3.0300 | 2.2600 | 24.02.11 | 20.09.2011 | अगस्त-2012 | मार्च-2018 | पूर्ण | 37.050 | पूर्ण | 0.00 | ||
Remarks: कार्य पूर्ण 13 से 14 एम.एल.डी. श्राव शोधित किया जा रहा है | ||||||||||||||||||||||||
28 | सीवरेज योजना, नरोरा, बुुलन्दशहर | 0 MLD | 0 No. | 0 KM | 0 No. | 0 | पूर्ण | 36.210 | 74.74% | ई.ए.पी. | 48.4500 | 39.7300 | 2.2600 | 6.4600 | 04.03.14/ 09.05.2018 | 15.6.2015 | मई-2018 | मार्च-2018 | पूर्ण | 36.210 | पूर्ण | 0.00 | ||
Remarks: कार्य पूर्ण | ||||||||||||||||||||||||
29 | सीवरेज योजना, गढ़मुक्तेश्वर | 0 MLD | 0 No. | 0 KM | 0 No. | 0 | पूर्ण | 39.950 | 85.9% | नाॅन ई.ए.पी. | 46.5100 | 40.6800 | 3.2500 | 2.5800 | 24.02.11 | 7.9.2011 | अगस्त-2013 | अगस्त-2013 | पूर्ण | 39.950 | पूर्ण | 0.00 | ||
Remarks: कार्य पूर्ण 0.7 एवं 3.5 एम.एल.डी. श्राव शोधित किया जा रहा है | ||||||||||||||||||||||||
30 | सीवरेज अपग्रेडेशन का कार्य, अनूपशहर, बुलन्दशहर | 0 MLD | 0 No. | 0 KM | 0 No. | 0 | पूर्ण | 65.020 | 85.79% | ई.ए.पी. | 75.7900 | 67.1200 | 5.2700 | 3.4000 | 19.05.14 | 9.1.2016 | मई-2017 | सितम्बर-2018 | पूर्ण | 65.020 | पूर्ण | 0.00 | ||
Remarks: कार्य पूर्ण 1.2 एवं 0.6 एम.एल.डी. श्राव शोधित किया जा रहा है | ||||||||||||||||||||||||
31 | सीवरेज योजना, डिस्ट्रिक्ट-सी, प्रयागराज | 0 MLD | 0 No. | 0 KM | 0 No. | 0 | पूर्ण | 157.26 | 91.99% | ई.ए.पी. | 170.9500 | 154.0090 | 9.8685 | 7.0725 | 27.11.13/ 13.09.2019 | 07.4.2015 | सितम्बर-2016 | अक्टूबर-2018 | पूर्ण | 157.26 | पूर्ण | 0.0 | ||
Remarks: कार्य पूर्ण। योजना की पर्व स्वीकृत लागत रू. 146.87 करोड है। एन.एम.सी.जी. के पत्र दिनांक 13.11.2019 के द्वारा रू. 170.9499 करोड़ की पुनरीक्षित जारी की गयी जिसमें अतिरिक्त कार्य- 23500 नग सीवर हाउस कनेक्शन माह, जून-2020 तक किया जाना प्रस्तावित है। उक्त प्रस्तावित 23500 नग सीवर हाउस कनेक्शन के सापेक्ष 22550 पूर्ण किये जा चुके है। | ||||||||||||||||||||||||
32 | सीवरेज योजना, डिस्ट्रिक्ट-बी, प्रयागराज | 0 MLD | 0 No. | 0 KM | 0 No. | 0 | पूर्ण | 289.80 | 96.33% | ई.ए.पी. | 300.8425 | 278.2669 | 18.8158 | 3.7598 | 31.12.14/ 11.11.2019 | 25.6.2016 | दिसम्बर-2017 | दिसम्बर-2018 | पूर्ण | 289.80 | पूर्ण | 0.0 | ||
Remarks: कार्य पूर्ण। योजना की पर्व स्वीकृत लागत रू. 265.86 करोड है। एन.एम.सी.जी. के पत्र दिनांक 11.11.2019 के द्वारा रू. 300.8425 करोड़ की पुनरीक्षित जारी की गयी जिसमें अतिरिक्त कार्य- 25000 नग सीवर हाउस कनेक्शन माह, जून-2020 तक किया जाना प्रस्तावित है। उक्त प्रस्तावित 25000 नग सीवर हाउस कनेक्शन के सापेक्ष 27500 पूर्ण किये जा चुके है। रू0 5.57 करोड़ भुगतान प्राइस एडजेस्टमेन्ट मद में। | ||||||||||||||||||||||||
33 | इन्टरसेप्शन एण्ड डायवर्जन नाला, सीसामऊ, कानपुर | 0 MLD | 0 No. | 0 KM | 0 No. | 0 | पूर्ण | 60.10 | 94.2% | नमामि गंगे | 63.8000 | 57.6400 | 4.6100 | 1.5500 | 03.10.16 | 23.5.2017 | अप्रैल -2018 | अक्टूबर-2018 | पूर्ण | 60.10 | पूर्ण | 0.00 | ||
Remarks: कार्य पूर्ण। | ||||||||||||||||||||||||
34 | सीवरेज योजना, डिस्ट्रिक्ट-ए, प्रयागराज | 0 MLD | 0 No. | 0 KM | 0 No. | 0 | पूर्ण | 281.94 | 94.17% | ई.ए.पी. | 299.3956 | 269.1072 | 19.7504 | 10.5380 | 20.02.14/ 11.11.2019 | 27.4.2015 | नवम्बर-2017 | अप्रैल -2018 | पूर्ण | 281.94 | पूर्ण | 0.0 | ||
Remarks: योजना की पर्व स्वीकृत लागत रू. 288.947 करोड है। एन.एम.सी.जी. के पत्र दिनांक 11.11.2019 के द्वारा रू. 299.3956 करोड़ की पुनरीक्षित जारी की गयी जिसमें अतिरिक्त कार्य-26000 नग सीवर हाउस कनेक्शन माह, जून-2020 तक किया जाना प्रस्तावित है। उक्त प्रस्तावित 26000 नग सीवर हाउस कनेक्शन के सापेक्ष 26000 पूर्ण किये जा चुके है। रू0 6.71 करोड़ भुगतान प्राइस एडजेस्टमेन्ट मद में। | ||||||||||||||||||||||||
35 | अयोध्या नगर, जनपद-अयोध्या में आई एण्ड डी. के निर्माण कार्य | 0 MLD | 0 No. | 0 KM | 0 No. | 0 | पूर्ण | 15.58 | 41.36% | नमामि गंगे | 37.6700 | 16.2500 | 1.0955 | 20.3200 | 11.06.18 | 17.11.2018 | नवम्बर-2019 | दिसम्बर-2019 | पूर्ण | 15.58 | पूर्ण | 0.00 | ||
Remarks: कार्य पूर्ण। | ||||||||||||||||||||||||
36 | बिठूर नगर कानपुर में आई.एण्ड डी.एवं एस.टी.पी. के कार्य | 0 MLD | 0 No. | 0 KM | 0 No. | 0 | पूर्ण | 10.000 | 74.63% | नमामि गंगे | 13.4000 | 10.2500 | 0.7000 | 2.4500 | 10.10.17 | 20.9.2018 | अप्रैल -2018 | दिसम्बर-2019 | पूर्ण | 10.000 | पूर्ण | 0.00 | ||
Remarks: कार्य पूर्ण। | ||||||||||||||||||||||||
37 | वृन्दावन, मथुरा में नवीनीकरण एवं उच्चीकरण का कार्य | 0 MLD | 0 No. | 0 KM | 0 No. | 0 | पूर्ण | 20.48 | 47.83% | नमामि गंगे | 42.8200 | 26.7400 | 1.1900 | 14.8900 | 29.03.17 /07.05.18/ 11.12.2019 | 1.12.2018 | मार्च-2018 | फरवरी-2020 | पूर्ण | 20.48 | पूर्ण | 0.0 | ||
Remarks: कार्य पूर्ण। | ||||||||||||||||||||||||
38 | रामगंगा सीवरेज परियोजना, मुरादाबाद | 58 MLD | 11 No. | 233.25 KM | 0 No. | 0 | 99.90% | 265.68 | 80.5% | नाॅन EAP | 330.0500 | 278.8500 | 19.0300 | 32.1700 | 24.02.11/ 31.07.2020 | 21.10.2011 | फरवरी-2014 | अप्रैल-2013 | 99.90% | 265.68 | 0.00% | 0.0 | ||
Remarks: STP/SPS are commissioned. Hydro testing in some part of sewer line is in progress. | ||||||||||||||||||||||||
39 | सीवरेज योजना सीवरेज डिस्ट्रिक्ट-1, कानपुर | 0 MLD | 4 No. | 102.92 KM | 0 No. | 0 | Under Commissioning | 432.60 | 100.49% | ई.ए.पी. | 430.4900 | 395.2000 | 23.8100 | 11.4800 | 18.10.16/ 10.12.2019 | 17.8.2017 | जुलाई-2020 | अगस्त-2020 | 99.00% | 432.60 | 0.0% | 0.0 | ||
Remarks: Under Commissioning रू0 43.53 करोड़ भुगतान प्राइस एडजेस्टमेन्ट मद में। | ||||||||||||||||||||||||
40 | रमना वराणसी में 50MLD क्षमता के STP का निर्माण एवं रख-रखाव का कार्य। (HAM PPP) | 50 MLD | 0 No. | 0 KM | 0 No. | 0 | Under O&M ... | 99.04 | 61.4% | नमामि गंगे | 161.3100 | 102.0000 | 8.1600 | 51.1500 | 23.12.2016/21.09.2017 | 19.02.2018 | दिसम्बर-2019 | नवम्बर-2019 | 97.00% | 99.04 | 0.00% | 0.0 | ||
Remarks: UndeO&M. ( Expenditure Including NMCG+ SPV release) | ||||||||||||||||||||||||
41 | रामनगर,वाराणसी में आई.एण्ड डी.एवं एस.टी.पी.के कार्य | 1 MLD | 0 No. | 380 KM | 0 No. | 0 | 100.0 % | 23.13 | 31.72% | नमामि गंगे | 72.9100 | 23.8800 | 1.7500 | 47.2800 | 28.07.17 | 1.12.2018 | दिसम्बर-2019 | August- 2020 | 100.00% | 23.13 | 0.00% | 0.0 | ||
Remarks: Under O& M | ||||||||||||||||||||||||
42 | प्रयागराज नगर के निर्मित STP के पुर्नरोद्धार तथा 15 वर्ष का O&M (HAM PPP) | 0 MLD | 0 No. | 0 KM | 0 No. | 0 | Under O &M | 197.38 | 21.83% | नमामि गंगे | 904.0000 | 58.1500 | 0.0000 | 845.8500 | 09.03.18 | 16.09.2019 | मार्च-2020 | सितम्बर-2021 | 100.00% | 197.38 | 0.0% | 0.0 | ||
Remarks: Under Trial & run. ( Expenditure Including NMCG+ SPV release) | ||||||||||||||||||||||||
43 | इटावा नगर, में आई एण्ड डी. एवं एस.टी.पी. के कार्य | 21 MLD | 0 No. | 0 KM | 0 No. | 0 | 100.0% | 42.15 | 29.98% | नमामि गंगे | 140.6000 | 56.8600 | 3.8900 | 79.8500 | 28.02.2019 | 22.7.2019 | अक्टूबर-2020 | April-2021 | 100.0% | 42.15 | 0.00% | 0.0 | ||
Remarks: Under Trial & Run | ||||||||||||||||||||||||
44 | कासगंज नगर, में आई एण्ड डी. एवं एस.टी.पी. के कार्य | 1 MLD | 1 No. | 2.675 KM | 0 No. | 0 | 100.0% | 34.99 | 45.6% | नमामि गंगे | 76.73 | 36.6000 | 2.4900 | 37.6400 | 24.12.2018 | 5.7.2019 | दिसम्बर-2020 | जुलाई-2021 | 100.0% | 34.99 | 0.0% | 0.0 | ||
Remarks: Under Trial & Run | ||||||||||||||||||||||||
45 | चुनार नगर में फिकल स्लज मैनेजमेन्ट का कार्य | 1 MLD | 0 No. | 0 KM | 0 No. | 0 | Under Trial & run. | 1.350 | 50% | नमामि गंगे | 2.7000 | 2.1556 | 0.0690 | 0.4800 | 07.03.2019 | 9.11.2019 | मार्च-2020 | सितम्बर-2020 | 100.00% | 1.350 | 0.0% | 0.0 | ||
Remarks: Under Trial & run. | ||||||||||||||||||||||||
46 | फिरोजाबाद नगर, में आई एण्ड डी. के कार्य | 0 MLD | 2 No. | 0 KM | 2 No. | 0 | 100.00% | 21.75 | 42.58% | नमामि गंगे | 51.0800 | 23.9200 | 1.6350 | 25.5300 | 01.03.2019 | 14.11.2019 | सितम्बर-2020 | June-2021 | 100.00% | 21.75 | 0.0% | 0.0 | ||
Remarks: Both Nala Tapping have been completed. Approx 45 MLD waste water is being pumped to 67 MLD STP for treatment. |
# | Name of Project | Overall Progress Financial (in Cr.) | Overall Progress Physical | Executive Agency | Contractor | Funding Agency | Date of Sanction | Date of Start | Date of Completion | Sanctioned Cost (in Cr.) | Contract Cost (in Cr.) | |||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Ghat Cleaning Projects at 4 towns | ||||||||||||||
1 | 1. Bithoor | 1.12 (43%) | 73.71% | N P Bithoor | M/S Vishal Protection Force ,302, SUNVIEW Apartment , Pkt -4, Sector-11, Dwarka, NewDelhi-110075 | NMCG | 1.06.2019 | 31.05.2022 | 2.61 | 2.58 | ||||
2 | 2. Kanpur | 1.37 (40.29%) | 73.71% | M C Kanpur | M/S Vishal Protection Force ,302, SUNVIEW Apartment , Pkt -4, Sector-11, Dwarka, NewDelhi-110075 | NMCG | 1.06.2019 | 31.05.2022 | 3.46 | 3.4 | ||||
3 | 3.Prayagraj | 1.37 (41.64%) | 73.07% | M C Prayag raj | M/S Vishal Protection Force ,302, SUNVIEW Apartment , Pkt -4, Sector-11, Dwarka, NewDelhi-110075 | NMCG | 10.06.2019 | 09.06.2022 | 3.3 | 3.29 | ||||
4 | 4.Mathura Vrindavan | 1.61 (45.35%) | 73.07% | M C Math. Vrindavan | M/S Vishal Protection Force ,302, SUNVIEW Apartment , Pkt -4, Sector-11, Dwarka, NewDelhi-110075 | NMCG | 10.06.2019 | 09.06.2022 | 3.6 | 3.55 | ||||
Ghat Related Projects | ||||||||||||||
5 | Rehabilitation &Development Works of Ghats and Crematoria | 239.36 (70.32%) | 100 | Engineers India Ltd | Engineers India Ltd | NMCG | 8.09.2016/07.03.2019 | 08.09.2016/7.03.2019 | 31.03.2021 | 340.38 | 340.38 | |||
6 | Ghat Cleaning Projects at Varanasi | 0 | 16.34% | Municipal Corporation Varanasi | Vishal Protection Force | NMCG & VNN | 13.09.2019 | 15.04.2021 | 14.04.2023 | 10 Crore. | 8.21 Crore ( 2 years ) | |||
7 | Improvement of Bathing Ghats at River Ganga in Varanasi | 5.85 (56.7%) | 100 | Municipal Corporation Varanasi | M/s S&P Infra.Dev.Limited | NMCG | 15.01.2018 | 18.04.2018 | 31.12.2020 | 11.73 | 10.3 | |||
Forestry, Bio-diversity and Wetlands Project | ||||||||||||||
8 | Forestry Intervention for Ganga - 2018-2019 APO 1. Natural Landscape (1593 ha.) 2. AG Landscape (1838.95 ha.)3. Uraban Landscape (190.59 ha.) 4. Conservation Interventation (488.49 ha.) 5 Others: (4.65 ha) Total Area: 4115.68 Ha ha | 12.56 (57.45%) | 1. Natural Landscape (1594 ha.) , Saplings planted: 7.50 Lakhs 2. AG Landscape (1759.96 ha.) saplings planted 2.64 Lakhs 3. Urban Landscape (115.59 ha.) 4. Conservation Intervention (7.48 ha. ) 5. Others: (0) Total Area: 3477.03 ha. | Forest & C.C. Department | Forest & C.C. Department | NMCG | 01.06.2018 | 01.06.2018 | 30.06.2019 | 21.861 | 21.8614 | |||
9 | Forestry Intervention for Ganga and Gomti River - 2019-2020 APO Ganga: 1. Natural Landscape (325 ha.) 2. AG Landscape (260.51 ha.) 3. Urban Landscape (308.26 ha.) 4. Conservation Interventation (52.36 ha.) 5. Others: (4.65 ha) Total Area: 946.13 ha Gomti: 1. Natural Landscape (193 ha.) 2. AG Landscape (1048.07 ha.) 3. Urban Landscape (50.04 ha.) 4. Conservation Interventation (56.98 ha.) 5. Others: (4.65 ha) Total Area: 1349.08 ha | 6.10 Cr. | Ganga: 1. Natural Landscape (468.45 ha.), Sapling planted 3.81466 lakhs. 2. AG Landscape (325 ha.) Sapling planted 0.21 lakhs 3. Urban Landscape (0 ha.) 4. Conservation Intervention (0 ha.) 5. Others: ( 0 ha) Total Area: 512 ha. Soil work under progress Gomti: 1. Natural Landscape (96.45 ha.), Sapling planted 0.79 lakhs 2. AG Landscape (185 ha.), Sapling planted 0.27 lakhs 3. Urban Landscape (0 ha.) 4. Conservation Intervention (1.30 ha.) 5 Others: (0 ha) Total Area: 282.75 ha. Soil work under progress . | Forest, Environment & C.C. Department | Forest & C.C. Department | NMCG | 24.09.2019 | 24.09.2019 | 30.09.2020 Forest Department has requested to NMCG for extension of project period till 31.03.2022 via letter dated 08.12.2020 | 22.332 | 22.3323 | |||
10 | Forestry Intervention for Ganga and Gomti River - 2020-2021 APO Ganga: 1. Natural Landscape (1528 ha.) 2. AG Landscape (1150.21ha.) 3. Urban Landscape (248.51 ha.) 4. Conservation Interventation ( 109.34 ha.) 5. Others: Total Area: 3036.07 ha | Rs. 3.5328 Cr utilized | 1. Natural Landscape (1528 ha.) 2. AG Landscape (21ha.) 3. Urban Landscape (83.1 ha.) Total Area: 1632.1 ha | Forest & C.C. Department | Forest & C.C. Department | NMCG | 24.09.2020 | 24.09.2020 | 24.09.2021 | 12.46 | 12.46 | |||
11 | Forestry Intervention for Ganga - 2018-2020 Ganga Grams Plantation | 17.88 (44.7%) | Total- 3132.21 ha. area planted . 1153.56 ha./9.30 Lakhs saplings planted in 2018-19 and 2019-20 under Natural Landscape I phase. AG landscape- 78.54 ha. (11783 Saplings planted). 1978.86 ha. (1622479 saplings planted) in Natural Landscape phase II in 2019-20 and 2020-21. | Forest & C.C. Department | Forest & C.C. Department | NMCG | 27.08.2018 | 27.08.2018 | 31.10.2020 | 40 | 40 | |||
12 | Expanding conservation breeding programme of frshwater turtles & gharials at kukrail gharial rehabilitation center, Lucknow | 1.50 Cr | Feeding of Gharial breeding stock and hatching completed.Water drainage repair and plumbing completed. Electric line repair Completed.Wages to keeper/watchman/sweeper completed.Construction of incubation room cum Gharial and Turtle Nursery Completed.Renovation of old turtle pond nearing completion. Isolation enclosure completed. Animal hospital and laboratory upgradation completed. One Rescue workshop organised for front line staffs. Education trips of students of 05 school students organised, Display board installation done. Sand filling in the pond has been done. Purchased AC has been done Purchase of boats, Motor boat has been done. | Environment Forest & CC Department | Environment Forest & CC Department | NMCG | 08.03.2019 | 8.03.2019 | 2019-2022 | 3.13 | 3.13 | |||
13 | Promotion of cultivation of Medicinal Plants on Ganga Basin in U.P. 2018-2020 Targets. 1. Forest Nurseries=17, 2. Farmer Nurseries=50 in 2500 ha. Area 3. Cluster formation=50 4. Post Harvesting Management, Marketing, Certificate and Insurance | 4.07 (11.4%) | 13 Dept. nurseries (Target-17), 49 Farmer Nurseries (Target-50) & Farmers Clusters Formation -28 (Tartget-50)/ Under progress | Forest & C.C. Department | Forest & C.C. Department | NMCG | 29.08.2018 | 29.08.2018 | 29.08.2020 | 35.46 | 35.46 | |||
14 | Conserving and sustainbly managing Gangetic Flood plain Wetlands of Uttar Pradesh | 1.86 Cr. | 1. Field training for frontline state forest department officials 2. Development of Protocol for Rapid Assessment of wetlands Ecosystem Services (RAWES) 3. Development of wetlands delineation protocol 4. Development of wetlands monitoring protocol 5. GIS Lab Enhancement a- GIS Cell Infrastructure Strengthen- Completed b- Data and consumables- Satellite Data Procurement, Consumables & GIS Software Licenses Completed c- Mapping to 280 wetland & LULC classification work completed | U P State Wetlands Consvervation Authority. | UPSWCA | NMCG | 16.10.2019 Revised AA&ES 02.06.2020 | 16.10.2019 | 02.06.2021 | 4.15 | 4.15 | |||
15 | Restoration and Conservation of 08 Kunds in Varanasi. | 6.82 ( 67.79%) | 85 | Varanasi Development Authority | M/s Chinmay Construction | NMCG | 14.02.2019 | 08.07.2019 | 30.09.2021 | 18.96 | 10.06 | |||
UPPCB Related Projects | ||||||||||||||
16 | Strengthening of Laboratories of U P Pollution Control Board. | 13.59 Cr. and 2.92 Cr. committed for payment to firms | 1. Minor Instruments purchased by the UPPCB 2. Advance Instruments have been purchased and supplied to regional and Central Lab of UPPCB except few. 3. Once Central and 7 regional Laboratory development has been done. 4. Chemical and Glassware purchased 5. Staffs for project already hired. 6. UPPCB is regularly sending Water Quality Data of Ganga and its tributaries rivers, drains, STPs and CETPs etc. via soft copy and also given password of Portal. 7 Regional Lab has recognized NABL accreditation. | U P State Pollution Control Board | U P State Pollution Control Board | NMCG | 06.06.2018 | 06.06.2018 | 05.06.2023 | 36.08 | 36.08 | |||
Bioremediation -KUMBH Projects | ||||||||||||||
17 | Enhanced Natural Attenuation for In-Situ Nalla Treatement of Prayagraj | 3.98 (36.5%) | 6 drains of Jhusi, Prayagraj were awarded for treatment on RENUE technology to NEERI for 02 years during the Kumbh. NEERI has treated 6 drains only 12 months as per the TPI report and the balance amount has been released by the SMCG-UP after the technical evaluation. | NEERI | NEERI | NMCG | 25.09.2018 | 01.01.2019 | 30.06.2021 | 10.90 | 10.90 | |||
Bioremediation of drains -Pilot Projects | ||||||||||||||
18 | Treatment of Ramnagar drain, Varanasi using Bioremediation. 23.35 MLD | 1.79 (41.43%) | 60 | SMCG-UP | M/s Bint -Biotech Pvt Ltd | NMCG | 26.04.2018 | 27.02.2019 | 27.05.2020 extended upto 31/03/2021 | 4.32 | 4.32 | |||
19 | Treatment of Rampur drain, Rampur using Bioremediation 194 MLD | 4.15 (29.3%) | 68 | SMCG-UP | M/s Tech Air mart | NMCG | 9.11.2018 | 13.05.2019 | 13.10.2020 | 14.16 | 14.16 | |||
IEC Projects | ||||||||||||||
20 | Annual Action Plan 2021-22 - Communication and Public Outreach activities. | 0 | Regular Social Media campaigns , Radio for Ganga Quest ( All through till 5th June 2021) , World Environment Day 5th June 2021 Day , Ganga Dushera 20th June 2021 | S.M.C.G ,District Ganga Committee & Stake holders | - | NMCG | 27/07/2021 | 01-04-2021 | 31-03-2022 | 5.35 |
# | Name of Project | Overall Progress Financial | Overall Progress Physical | Executive Agency | Contractor | Funding Agency | Date of Sanction | Date of Start | Date of Completion | Sanctioned Cost (in Cr.) | Contract Cost (in Cr.) | Remarks | ||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Industrial Projects | ||||||||||||||
1 | Ugradation of 4.5 MLD CETP Banthar | 0 | 0 | BIPCC (Banthar industrial pollution control company | NMCG | 21.02.2020 | 108.96 | Letter of Acceptance issued to Joint Venture EMS Infracon dated Pvt Ltd & Sarvo Technologies Dated 06/01/2022. Agreement signed on 7/02/2022. | ||||||
2 | Construction of 20 MLD Common Effluent Treatment Plant (CETP) for Tannery Cluster at Jajmau Kanpur | 140 crore | 42 | JTETEA (Jajmau Tannery Effluent Treatment Association) | VA Wabag Ltd | NMCG | 11.02.2019 | 11.04.2019 | 01/06/2022 | 617 | 520.18 capex-450.02, opex-70.16 | Work is under progress | ||
3 | Upgradation of 6.25 MLD CETP Mathura | 70 % | MACPNL Mathura Oudhougic chetra & pradushan Nivaran company | M/S Fateh Enviro Engineers | NMCG | 28.11.2018 | 01.08.2021 | 19.03.2022 | 13.97 | 12.69 | construction work is in progress | |||
4 | I & D works and construction of 7.5 MLD CETP at Gorakhpur Industrial Development area | 0 | 0 | SPV | NMCG | 11/01/2022 | 93.52 Crores | NMCG has has sanctioned the project vide AA & ES dated 11/01/2022. NMCG shall bear 50 % of the project cost (Rs 46.76 cr) as Central government funding.. 25 % of the total project cost will be through GIDA and 25 % of the total project cost through Infrastructure and industrial development department. Tendering process will be done by SPV and GIDA. | ||||||
5 | Farrukhabad CETP of 1.5 MLD at New proposed FTPPL | FTPPL(Farrukhabad Textile park pvt ltd) | NMCG | Meeting was organized under the chairmanship of IIDC, Govt of UP between FTPPL board and UPSIDA . IIDC has instructed UPSIDA for the following. a) Not to charge any overhead charge on the land cost. b) UPSIDA should charge interest to SPV on the prevailing rates. c) SPV should expedite the process of Land registry by paying the estimated cost of land. d)SPV shall get the Layout map approved by the competant authority. e) After the textile park is developed SPV shall do the registry of the plots to Factories | ||||||||||
6 | Upgradation of 2.15 MLD CETP to 2.6 MLD loacted at Unnao Industrial area, Unnao | - | - | UTPCC ( Unnao Tanners Pollution control company) | NMCG | 22.06.2020 | 67.88 | - | Bids opened on 18.10.2021 . Evaluation is under progress. |
S.No. | Description | |
1 | Total No. of STPs | 109 |
2 | Total Established Capacity (MLD) | 3471.84 MLD |
3 | Total Utilized Capacity (MLD) | 2616.74 MLD |
4 | Utilization Percentage (%) | 75.37% |
Sl. No. | Name and Address of STP | Year of Commissioning | City/ Town / District | Installed Capacity (MLD) | Utilized Capacity (MLD) | Technology/process STP based | Authority responsible for O&M of STP | Updation Date | pH | BOD (mg/l) | COD (mg/l) | TSS (mg/l) | TC (MPN/100ml) | FC (MPN/100ml) | whether Achieving or Not Achieving |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 |
1 | 10.445 MLD STP near Tixi Tempel | 2001 | Etawah | 10.445 | 10.445 | WSP | Yamuna Pollution Control Unit, UP Jal Nigam, Agra | 12.10.21 | 8 | 26 | 296 | 78 | 210000 | 14000 | Achieving |
2 | 13.5 MLD STP at Mauja Umrain | 2013 | Etawah | 13.5 | 3 | WSP | Nagar Palika Parishad, Etawah | 12.10.21 | 8.3 | 32 | 320 | 83 | 270000 | 170000 | Not Achieving |
3 | 03 MLD STP Firozabad | 2014 | Firozabad | 3 | 3 | UASB | Jal Kal | 01.10.21 | 8.1 | 37 | 304 | 92 | 300000 | 180000 | Not Achieving |
4 | 67 MLD Mohammadpur, Biharipur | 2020 | Firozabad | 67 | 67 | ASP+ extended aeration | U.P. Jal Nigam | 22.10.21 | 7.4 | 30 | 304 | 67 | 300000 | 210000 | Not Achieving |
5 | 1.65 MLD Saifai | 2013 | Etawah | 1.65 | 1.65 | SBR | U.P. Jal Nigam | 12.10.21 | 7.4 | 23 | 248 | 76 | 170000 | 110000 | Achieving |
6 | 23 MLD STP at Mauja Odenya, Padaria | 2014 | Mainpuri | 23 | 10.4 | UASB | Nagar Palika Parishad | 01.10.21 | 7.1 | 33 | 296 | 69 | 280000 | 160000 | Not Achieving |
7 | 3.42 MLD Near Divyang kendra | 2000 | Chitrakoot | 3.42 | 3.42 | Oxidation Pond | U.P. Jal Nigam | 10.09.20 | 7.5 | 22 | 115.2 | 86 | 92000 | 43000 | Achieving |
8 | 42 MLD, Sajari Kanpur | 2016-17 | Kanpur | 42 | 22 | ASP | U.P. Jal Nigam | 18.10.21 | 7.98 | * | 120 | 52 | 63000 | 41000 | Achieving |
9 | 36 MLD (9 MLD CETP + 27 MLD STP) | 01.06.1994 | Kanpur | 36 (9 MLD CETP + 27 MLD STP) | 36 (9 MLD CETP + 27 MLD STP) | ASP | U.P. Jal Nigam | 20.10.21 | 7.92 | * | 200 | 116 | 110000 | 63000 | Not Achieving |
10 | 210 MLD, Bingawan Kanpur | 2015-16 | Kanpur | 210 | 140 | UASB | U.P. Jal Nigam | 18.10.21 | 7.42 | * | 80 | 52 | 1400000 | 700000 | Achieving |
11 | 2.7 MLD Fatehgarh | 1992-93 | Farrukhabad | 2.7 | 2 | WSP | U.P. Jal Nigam | 18.10.21 | 8.49 | * | 140 | 56 | 130000 | 68000 | Achieving |
STP | |||||||||||||||
12 | 5 MLD, Jajmau Kanpur | 1989-90 | Kanpur | 5 | 5 | UASB | U.P. Jal Nigam | 20.10.21 | 7.92 | * | 200 | 116 | 110000 | 63000 | Not Achieving |
13 | 43 MLD Jajmau, Kanpur | 2020 | Kanpur | 43 | 37 | ASP | U.P. Jal Nigam | 20.10.21 | 7.92 | * | 200 | 116 | 110000 | 63000 | Not Achieving |
14 | 130 MLD Jajmau, Kanpur | 1998-99 | Kanpur | 130 | 120 | ASP | U.P. Jal Nigam | 20.10.21 | 7.92 | * | 200 | 116 | 110000 | 63000 | Not Achieving |
15 | 13 MLD Jalalpur, Amrapur | 2017 | Kanpur Dehat | 13 | 10 | SBR | U.P. Jal Nigam | 26.10.21 | 7.68 | * | 80 | 52 | 68000 | 33000 | Achieving |
16 | 50 MLD STP Numayadahi | 2013 | Prayagraj | 50 | 50 | Bio-tower | Ganga Pollution control unit, U.P. Jal Nigam | 19.10.21 | 7.41 | 22 | 48 | 20 | 15000 | 450 | Achieving |
17 | 10 MLD STP Ponghat | 2013 | Prayagraj | 10 | 10 | Bio-tower | Ganga Pollution control unit, U.P. Jal Nigam | 18.10.21 | 7.37 | 16 | 40 | 18 | 70000 | 400 | Achieving |
18 | 25 MLD STP Kodra | 2013 | Prayagraj | 25 | 25 | Bio-tower | Ganga Pollution control unit, U.P. Jal Nigam | 18.10.21 | 7.29 | 20 | 46 | 24 | 11000 | 450 | Achieving |
19 | 60 MLD STP Rajapur | 2013 | Prayagraj | 60 | 60 | UASB | Ganga Pollution control unit, U.P. Jal Nigam | 20.10.21 | 7.53 | 22 | 52 | 26 | 22000 | 680 | Achieving |
20 | 29 MLD STP Salori-1 | 2007 | Prayagraj | 29 | 29 | FAB | Ganga Pollution control unit, U.P. Jal Nigam | 19.10.21 | 7.74 | 24 | 52 | 30 | 28000 | 920 | Achieving |
21 | 14 MLD STP Salori-2 Expansion | 2016 | Prayagraj | 14 | 14 | SBR | Ganga Pollution control unit, U.P. Jal Nigam | 20.10.21 | 7.23 | 10 | 28 | 12 | 7900 | 400 | Achieving |
22 | 80 MLD STP Naini | 2013 | Prayagraj | 20 | 20 | ASP | Ganga Pollution control unit, U.P. Jal Nigam | 19.10.21 | 7.46 | 24 | 58 | 28 | 17000 | 680 | Achieving |
23 | 1999 | 60 | 60 | ||||||||||||
24 | 9.8 MLD Bhagwanpur STP | 1989 | Varanasi | 8.0+1.8 | 8.0+1.8 | ASP | U.P. Jal Nigam | 26.10.21 | 7.54 | 28 | 104 | 92 | 92000 | 35000 | Achieving |
25 | 80 MLD Dinapur STP | 1994 | Varanasi | 80 | 80 | ASP | U.P. Jal Nigam | 26.10.21 | 7.51 | 26 | 116 | 82 | 21000 | 9200 | Achieving |
26 | 50 MLD Ramana | 31.03.21 | Varanasi | 50 | 50 | SBR | U.P. Jal Nigam | 26.10.21 | 7.75 | 15 | 52 | 28 | 2100 | 1100 | Not Achieving |
27 | 10 MLD Ramnagar | 15.03.21 | Varanasi | 10 | 10 | Anaerobic Anoxic Oxic | U.P. Jal Nigam | 26.10.21 | 7.72 | 8 | 20 | 17 | 1100 | 700 | Achieving |
28 | 120 MLD Goithaha STP | 19.02.2019 | Varanasi | 120 | 120 | SBR | U.P. Jal Nigam | 26.10.21 | 7.57 | 14 | 64 | 28 | 1200 | 450 | Achieving |
29 | 140 MLD Dinapur STP | 11.11.2018 | Varanasi | 140 | 140 | ASP | U.P. Jal Nigam | 26.10.21 | 7.55 | 18 | 86 | 32 | 2400 | 1700 | Achieving |
30 | 12 MLD DLW STP | 06.04.1989 | Varanasi | 12 | 12 | ASP | DLW | 26.10.21 | 7.34 | 42 | 292 | 154 | 110000 | 54000 | Not Achieving |
31 | 14 MLD Pakka Pokhra | 1994 | Mirzapur | 14 | 14 | UASB | U.P. Jal Nigam | 25.10.21 | 7.51 | 44 | 202 | 116 | 43000 | 23000 | Not Achieving |
32 | 4 MLD Vindhyachal | 2008 | Vindhyachal / Mirzapur | 4 | 2.5 | WSP | U.P. Jal Nigam | 25.10.21 | 8.37 | 38 | 196 | 118 | 31000 | 17000 | Not Achieving |
33 | 15 MLD S.T.P. Jharkhandi, Maherwa ki Bari | 01.06.2015 | Gorakhpur | 15 | 15 | ASP | U.P. Jal Nigam | 26.10.21 | 7.52 | 10 | 60 | 30 | 1900 | 900 | Achieving |
34 | 30 MLD S.T.P. Opp. Manyavar Kanshiram Shahri Garib Awas Yojna, Deoria bypass Road | 01.02.2015 | Gorakhpur | 30 | 30 | ASP | U.P. Jal Nigam | 26.10.21 | 7.18 | 8 | 50 | 28 | 1700 | 800 | Achieving |
35 | 38 MLD STP, Mahilpur Road | 1998 | Saharanpur | 38 | 38 | UASB | Jal Kal | 27.10.21 | 7.7 | 21 | 188 | 45 | 940 | 790 | Achieving |
36 | 6.5 MLD Awas vikas Parishad STP | 2018 | Lucknow | 6.5 | 6.5 | SBR | U.P. Awas vikas Parishad | 18.10.21 | 8.34 | 22 | 112 | 29 | 33000 | 13000 | Achieving |
37 | 37.5 MLD Awas vikas Parishad STP | 2017 | Lucknow | 37.5 | 37.5 | SBR | U.P. Awas vikas Parishad | 18.10.21 | 8.22 | 25 | 118 | 38 | 49000 | 23000 | Achieving |
38 | 345 MLD STP, Bharwara | 2011 | Lucknow | 345 | 345 | UASB Reacter | U.P. Jal Nigam | 22.10.21 | 8.16 | 18 | 88 | 24 | 17000 | 7000 | Achieving |
39 | 56 MLD STP, Daulatganj | 2002 | Lucknow | 42+14 | 42+14 | FAB | U.P. Jal Nigam | 22.10.21 | 8.56 | 15 | 72 | 20 | 11000 | 780 | Achieving |
40 | 2011 | U.P. Jal Nigam | |||||||||||||
41 | 56 MLD Trans Hindon (Indirapuram), Ghaziabad | 2000 | Ghaziabad | 56 | 56 | UASBR | Nagar Nigam | 27.10.21 | 7.3 | 14 | 59 | 34 | 31000 | 26000 | Achieving |
42 | 56 MLD S.B.R., Bapudham, Ghaziabad | 2014 | Ghaziabad | 56 | 56 | SBR | Ghaziabad Development Authority | 20.10.21 | 7.55 |